Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />tip <br />• -• . <br />TEST DATE: 05/04/99 WORK ORDER NUMBER2208490 <br />CLIENT:ULTRANAR INC AUSTIN, TEXAS 78757 (512) 451-6334 SITE:ULTRANAR 502 <br />Tank ID: 3 <br />Tank manifolded: NO <br />Bottom to top fill in inches: <br />1.53.0 <br />Product: REG UNLEAD <br />Vent manifolded: YES <br />Bottom to grade in inches: <br />160.0 <br />Capacity in gallons: 12,094 Vapor <br />recovery manifolded: YES <br />Fill pipe length in inches: <br />58.0 <br />Diameter in inches: 95.00 <br />Overfill protection: YES <br />Fill pipe diameter in inches: <br />4.0 <br />Length in inches: 399 <br />Overspill protection: YES <br />Stage I vapor recovery: <br />DUAL <br />Material: DW STEEL <br />Installed: ATG <br />Stage II vapor recovery: <br />ASSIST <br />CP installed on: <br />COMMENTS <br />Start (in) <br />End (in) <br />New/passed Failed/replaced New/passed <br />Failed/replaced <br />Dipped Water Level: <br />L.D. #1 <br />L.D. #1 L.D. #2 <br />L.D. #2 <br />Dipped Product Level: <br />Make: <br />VAPORLESS <br />Probe Water Level: <br />Model: <br />LD2000 <br />Ingress Detected: Water Bubble <br />Uliage <br />S/N: <br />58405 <br />Test time: <br />Open time in sec: <br />3.00 <br />Inclinometer reading: <br />Holding psi: <br />31 <br />VacuTect Test Type: NOT <br />Resiliency cc: <br />135 NOT <br />VacuTect Probe Entry Point: TESTED <br />Test leak rate mi/m: <br />189.0 TESTED <br />Pressure Set Point: <br />Metering psi: <br />10 <br />Tank water level in inches: <br />Calib. leak in gph: <br />3.00 <br />Water table depth in inches: <br />Results: <br />PASS <br />Determined by (method): <br />Result: <br />COMMENTS <br />COMMENTS <br />Material: DW FIBERG <br />Impact Valves Operational: YES <br />Diameter (in): <br />2.0 <br />Length (ft): <br />80.0 <br />COMMENTS <br />Test psi: <br />50 <br />Bleedback cc: <br />125 <br />Test time (min): <br />30 <br />Test 1: Start time: <br />13:33 <br />Finish psi: <br />47 <br />NOT NOT <br />NOT <br />Vol change cc: <br />Test 2: Start time: <br />9 <br />13:44 <br />TESTED TESTED <br />TESTED <br />Finish psi: <br />48 <br />Vol change cc: <br />4 <br />Test 3: Start time: <br />13:55 <br />Finish psi: <br />49 <br />Vol change cc: <br />2 <br />Final gph: <br />0.008 <br />Result: <br />PASS <br />Pump type: PRESSURE <br />Pump make: RED <br />JACKET <br />Draft 05/05/1999 09:43 MSHAW <br />