My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:15:47 PM
Creation date
6/23/2020 6:46:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />E <br />RE: USA GAS 35 N. Cherokee Ln. Lodi, CA (SR0055412) <br />list). The component must bear the appropriate mark as required by the <br />independent testing organization. <br />5. Any changes in information and scope of work must be submitted to EHD for <br />approval prior to commencing work. All new addenda supersede the previous <br />ones. <br />6. Contact Aris Cacapit to arrange the following inspections (a 48 hour notice is <br />required <br />a. Measurement of drop tubes to verify the 95% tank volume shutoff. <br />b. One hour hydrostatic test (or equivalent) on the 89 & 91 spill bucket. <br />c. Verify minimum 5 gallon capacity. <br />d. Inspector to witness corrosion protection prior to backfill. <br />e. The test fluid should cover the top joint, and be no less than 1.5 inches <br />below the top of the spill bucket, regardless of the 89 & 91 spill <br />bucket's capacity. <br />f. Test operation of the drain valve of the 89 & 91 spill bucket. <br />g. Inspector to witness spill bucket testing after concrete is poured. <br />7. If concrete is broken near the UST, a third party tank integrity test and/or line <br />integrity test (or equivalent) must be performed, once concrete is poured in <br />accordance with the manufacturer's guidelines. Results must be received by the <br />EHD within seven days of returning the facility to operating condition. <br />8. An "Underground Storage Tank Certification of Installation/Modification" form <br />(form C) shall be submitted by the owner or the owners' agent [pursuant to (CCR) <br />2635(d)] before this repair will be considered complete by the EHD. <br />If you have any further questions, please contact me at (209) 468-3453, fax to (209) 468- <br />3433 or email to acacapit@sjcehd.com <br />Thank you, <br />.At�S C<a- 7 <br />Aris Cacapit <br />Environmental Health Specialist <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.