Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FO <br />1.[al►lli�] <br />Vi. PIPING CONSTRUCTION (Check a9 that appy) <br />UNDERGROUND PIPING <br />ABOVEGROUND PIPING <br />SYSTEM TYPE <br />1. PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY <br />191. PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY <br />❑ 1. SINGLE WALL ❑ 3. LINED TRENCH ❑ 99. OTHER <br />❑ I. SINGLE WALL 95. UNKNOWN <br />CONSTRUCTION/ <br />MANUFACTURER <br />It 2, DOUBLE WALL ❑®9_5. UNKNg?% <br />�❑ <br />2. DOUBLE WALL �.,t<.+9 9� OTHER <br />MANUFACTURER Yrl ®w P \ �i,I� eJ <br />MANUFACTURERi <br />❑ 1. BARE STEEL ❑ 8. IMP COMPATIBLE WI 100% METHANOL <br />❑ 1. BARE STEEL ❑ 8. FRP COMPATIBLE W/ 100% METHANOL <br />MATERIALS AND <br />❑ 2, STAINLESS STEEL ❑ 7. GALVANIZED STEEL <br />❑ 2. STAINLESS STEEL ❑ 7. GALVANIZED STEEL <br />CORROSION <br />PROTECTION <br />❑ 3. PLASTIC COMPATIBLE WITH CONTENTS ❑ 95. UNKNOWN <br />❑ 3. PLASTIC COMPATIBLE WITH CONTENTS ❑ 8. FLEXIBLE (HDPE) - ❑ 99. OTHER <br />❑ 4. FIBERGLASS ❑ 8. FLEXIBLE (HDPE) ❑ 99. OTHER <br />❑ 4. FIBERGLASS ❑ 9. CATHODIC PROTECTION <br />5. STEEL W/ COATING ❑ 9. CATHODIC PROTECTION <br />a <br />05. STEEL Al COATING ❑ 95. UNKNOWN <br />VII. PIPING LEAK DETECTION (Check a8 that apply) <br />UNDERGROUND PIPING <br />ABOVEGROUND PIPING <br />SINGLE WALL PIPING <br />SINGLE WALL PIPING - <br />PRESSURIZED PIPING (Check as that appy). <br />PRESSURIZED PIPING (Check all that apply): <br />❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF FOR <br />❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF FOR LEAK, <br />LEAK, SYSTEM FAILURE, AND SYSTEM DISCONNECTION + AUDIBLE AND VISUAL <br />SYSTEM FAILURE, AND SYSTEM DISCONNECTION *AUDIBLE AND VISUAL ALARMS <br />ALARMS <br />❑ 2. MONTHLY 0.2 GPH TEST <br />❑ 2. MONTHLY 0.2 GPH TEST <br />❑ 3. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 3. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 4. DAILY VISUAL CHECK <br />CONVENTIONAL SUCTION SYSTEMS: <br />CONVENTIONAL SUCTION SYSTEMS (Check all that apply): <br />❑ 5. DAILY VISUAL MONITORING OF PUMPING SYSTEM + TRIENNIAL PIPING INTEGRITY <br />❑ 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br />TEST (0.1 GPH) <br />❑ 8. TRIENNIAL INTEGRITY TEST (0.1 GPH) <br />SAFE SUCTION SYSTEMS (NO VALVES IN BELOW GROUND PIPING): <br />SAFE SUCTION SYSTEMS (NO VALVES IN BELOW GROUND PIPING): <br />❑ 7. SELF MONITORING <br />❑ 7. SELF MONITORING <br />GRAVITY FLOW: <br />GRAVITY FLOW (Check as that appy): <br />❑ 9. BIENNIAL INTEGRITY TEST (0.1 GPH) <br />❑ 9. DAILY VISUAL MONITORING <br />❑ 9. BIENNIAL INTEGRITY TEST (0.1 GPH) <br />SECONDARILY CONTAINED PIPING <br />PRESSURIZED PIPING (Check alt that apply): <br />SECONDARILY CONTAINED PIPING <br />PRESSURIZED PIPING (Checka#that apply): - <br />10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND <br />(Check one) <br />10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND (check one) <br />❑ a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br />❑ a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br />Lpb AUTO PUMP SHUT OFF FOR LEAKS, SYSTEM FAILURE AND SYSTEM <br />DISCONNECTION <br />b. AUTO PUMP SHUT OFF FOR LEAKS, SYSTEM FAILURE AND SYSTEM DISCONNECTION <br />❑ c. NO AUTO PUMP SHUT OFF <br />❑ c. NO AUTO PUMP SHUT OFF <br />N11. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITH FLOW SHUT OFF OR <br />[�, 11. AUTOMATIC LEAK DETECTOR <br />' <br />RESTRICTION <br />❑ 12. ANNUAL INTEGRITY TEST (0.1 GPH) <br />12. ANNUAL INTEGRITY TEST (0.1 GPH) <br />SUCTION/GRAVITY SYSTEM: <br />SUCTION/GRAVITY SYSTEM: <br />❑ 13. CONTINUOUS SUMP SENSOR + AUDIBLE AND VISUAL ALARMS <br />❑ 13. CONTINUOUS SUMP SENSOR + AUDIBLE AND VISUAL ALARMS <br />EMERGENCY GENERATORS ONLY (Check as that apply) <br />EMERGENCY GENERATORS ONLY (Check as that apply) <br />❑ 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF + AUDIBLE AND <br />❑ 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF + AUDIBLE AND VISUAL <br />VISUAL ALARMS <br />ALARMS <br />❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW SHUT OFF OR <br />❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) <br />RESTRICTION <br />❑ 18. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 18. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 17. DAILY VISUAL CHECK <br />❑ 17. DAILY VISUAL CHECK <br />Vill. DISPENSER CONTAINMENT <br />DISPENSER CONTAINMENT ❑ 1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑ 4. DAILY VISUAL CHECK <br />DATE IN LLED ❑ 2. CONTINUOUS DISPENSER PAN SENSOR + AUDIBLE AND VISUAL ALARMS ❑ 5. TRENCH LINER/ MONITORING <br />"'1f <br />C7 <br />3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR DISPENSER + AUDIBLE AND VISUAL ALARMS ❑ 8. NONE <br />IX. OWNER/OPERATOR SIGNATURE <br />I certify that the information provided herein is true and rate to the Hest of my knowledge. <br />SIGNATURE OF OWNER/OPERA T <br />DATE ® ® <br />NAME. OF OWNER/OPERATOR (prf <br />t <br />TITLE OF OWNER,OPERATO ° <br />U <br />i <br />Permit Number (For local use only) Permit Approved (For local use only)I Permit Expiration Date lFor local use onlv) <br />CUPAFORM (4/99) Formerly SWRCB Form B <br />