Laserfiche WebLink
12/22/2009 15:12 2093651 TANKNOLOGV <br />SWRCB, January 2002 <br />6, pTPING SUMP TESTING <br />Test Method Developed By: Sump Manufacturer 0 .Industry Standard <br />Other (Spec) <br />Test Method Used: Pressure Vacuum <br />Hother (Specify) <br />Test Equipment Used: vPlt: <br />PAGE 05/06 <br />page 5. <br />bfessional Engineer <br />Equipment Resolution: inches <br />11111 ��Omwm <br />Sump # lump # <br />es ❑N <br />es <br />Was sensor removed for testing? I x Yes N NA x Ycs N rd� x e$ 1V <br />Was sensor properly replaced and Ye ONcF]NA ff]Yes]Nc❑NA ❑YeC]N� <br />verifled functional after testing? <br />/imels 4e i;ifnrmey irn4 an renairs made prior to testing, and recommended follow -un for <br />es FIN <br />Yes ONOON <br />Yes 7No7N <br />Yes <br />tests) <br />es <br />i if the entire depth of the sump is not tested, specify how much was tested. if the answer to Mysf the questl�ns indicated with an <br />asterisk (*) is `TIO" or "NA", the entire sump must be tested, (See SWRCB LG -160) <br />Snuep # 3 DTE Sump <br /># 1 REG <br />Sump Diameter: <br />4Svv <br />48' <br />Sump Depth: <br />6311 <br />56" <br />Sump Material: <br />;fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />22 ^ <br />24" <br />Hi hest Pi ing Pcntration: <br />Height from Tank Top to Lowest <br />3011 <br />25" <br />Electrical Pentration: <br />Condition of sump prior to testing: <br />good <br />good <br />d <br />Portion of Sump Test;for <br />2411 <br />EyesL]NoQN <br />�Yes❑NoON, <br />Does turbine shut dn <br />sump sensor detectsboth <br />product and water)? <br />a�SseC <br />2-58ec <br />Turbine shutdown rtime: <br />Is system programmait-safe <br />�Yes[]NoONA <br />u <br />aYesDNoL]N <br />shutdown?* <br />Was fail-safe verified to be <br />xDYcs®No�N <br />E]YesF <br />operational?" <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5min <br />5ma n <br />test: <br />9:50 <br />0 <br />10:25 <br />0 <br />Test Start Time: <br />Initial Reading (RI )= <br />Test End Time: <br />10-20 <br />10;45 <br />Final Reading (Rr ): <br />-.00151, <br />-.1985" <br />Test Duration: <br />3 0min <br />2 0min <br />Change in Reading (Rr-RT ) <br />-.00151, <br />-.1985" <br />Pass/Fail Threshold or Criteria: <br />-+.002vr <br />-+.002" <br />PAGE 05/06 <br />page 5. <br />bfessional Engineer <br />Equipment Resolution: inches <br />11111 ��Omwm <br />Sump # lump # <br />es ❑N <br />es <br />Was sensor removed for testing? I x Yes N NA x Ycs N rd� x e$ 1V <br />Was sensor properly replaced and Ye ONcF]NA ff]Yes]Nc❑NA ❑YeC]N� <br />verifled functional after testing? <br />/imels 4e i;ifnrmey irn4 an renairs made prior to testing, and recommended follow -un for <br />es FIN <br />Yes ONOON <br />Yes 7No7N <br />Yes <br />tests) <br />es <br />i if the entire depth of the sump is not tested, specify how much was tested. if the answer to Mysf the questl�ns indicated with an <br />asterisk (*) is `TIO" or "NA", the entire sump must be tested, (See SWRCB LG -160) <br />