Laserfiche WebLink
2 ' • Page 1 of 1 <br />Aris Cacapit [EH] <br />From: m.vendeiro@att.net <br />Sent: Wednesday, December 02, 2009 2:11 PM <br />To: Aris Cacapit [EH] <br />Attachments: Jones ICC 001.jpg <br />Sir: <br />As requested the following is an updated work scope for the repairs at Plaza Liquors at 2420 W. Turner <br />Rd. in Lodi. <br />We plan to install the Blue Line split repair termination boots on the 87 and 91 product lines in their <br />piping sumps and the split piping terminations on the same set of pipes. <br />Once these are installed we will re -test the secondary piping to see if there are any failures in the udc's. <br />If so, we plan to install Blue Line split repair terminations as needed. <br />Also, attached is Steve Jones' ICC installer's certification. <br />Thank you, <br />Mark Vendeiro <br />MVP Petroleum Engineering, Inc. <br />mvpeng@att.net <br />916-205-1537 <br />12/2/2009 <br />