My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1998-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 2:04:33 PM
Creation date
6/23/2020 6:46:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2009
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1998-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />FROM FAX NO. :2093699162 c. 02 2009 10:20AM P8 <br />Ta fogy Inc: �^ <br />8501 N.1vloFae ixpressway, Suite,?l00'Austia,; TX 78759 (800) 964-0010 Policy 100-29-A <br />Jog C�,E ATCE F'® Rev: D . <br />Revised: 8/04/2008 <br />SITE'SACHECKLIST -- ®VF <br />-Site Name/#: Street Address: <br />W.O. <br />Arrival Time: Departure Time;Tr&vet Time: thers on site: Date <br />Scppe qf. Work and Tasks Perform JA's must be available for all tasks): <br />Repairs to Equipment or Parts Provided; <br />Follow-up actions required; equipment isolated; comments; <br />PPE -PERSONAL PROTECTIVE EQUIPMENT REQUIRED LChreck items used or mark if not applicable) <br />C Safety Vest® Safety Glasses Gloves 13Hearing Protection <br />® Steel Toe Soots U Splash les ❑ Hard Hat (1 Other <br />✓ PRE-TEST PROCEDURES Check each item completed or mark ~ if not aAaNcabW <br />Discuss safety procedures with site personnel' Nearest hospital: <br />2:" ❑ prior to fu'ef deliveries the UST system must be placed back. into working order. <br />3. . l" . Secure entire work areawith barricades (cones, flags, and caution tape, pennant flags, or other. perimetergaard). <br />...4. ®. Place fire extinguishers and "No Smoking" signs in the work area. <br />5. ❑ Implement L.ockout/Tagout per API 1646 (when accessing product piping during tasks) <br />Cl Ali.apptioabte equipment disabled during test(s). Secure the circuit breaker(s) with lockout devices and tags. . <br />0 Secure noz *$ with 'Out of Servioe"'bags and nylon ties. L Verify LOTO Is complete by trying to operate pumps. <br />" <br />'0'' C16se. ball valves or check valves on product piping. FI Disconnect electrical "bayonet" Conn o m the STP(s). <br />iu :a:::.':: " ;'•::'' =SAN 1N' ;•' : '` ::ea a Hasan <br />General <br />Le Technician Signature <br />eneral Safety; Checks: <br />All site personnei have been informed: / r� ((( t. <br />Fuel delivery has been informed. Site Rmr tiV. Narea qep u s nafu <br />IS 2• fuel delivery due today?ool, <br />LOTO procedures, have been.discussed and agreed. <br />Work areas.bitmc tided to protect workers, staff & public. <br />f:h V6,discussedjob ra ref wit11 technician. ` <br />✓ ' PQ$T TEST iPRQCEQURE$ (Check eacfritem completed or merle o if not aaPlicable <br />1. ❑. .Remove all "Lockoutlfagout" devices. ate^ <br />.2..' Fa Run all pump's and 'verify there are no. leaks: ❑ Impact Valve Test Ports under dispensers <br />❑ Leak Detector Threads on STP's LJ Functional Elements & Relief Screws <br />Install lead Wire'seal on all test plugs & leak detectors that were serviced. <br />CountLD threads: L1 L2 L3 L4' L5 L6 <br />4:' .i�f Check -following components operational: LJ ATO probes, sensors, & caps <br />C1Ball floats; !,� dry breaks & caps V �' Cathodic protection operational . <br />t_�. Containment sumps are dry Dispensers & POS operational <br />❑ Dispenser panels are replaced ❑ Drop tubes, till adapters'S. caps <br />C '.Leak detectors & vent tubes (3k Manhole covers and sump lids <br />4• Monitoring system is operational C Shear valves are open <br />❑. Siphon lines and manifold valves ❑ Siphon lines and manifold valves . <br />❑ STRfittings and bayonet connectors Fl Vents (not capped, plugged or isolated) <br />Ri9mov4 barric tides' <br />• .; ";aSl(311 Qit'8e". . '4oi~l old of rNtorlt:. "' Fi <br />n rime �eaa T� n�an .gnawre <br />General Safety checks: fp ,:Work area has n left tidy & safe- <br />Sit® staff.are aware..o .. work status`inf�ua ng any remaining Isolation.pre n si rtspr ve Signansre <br />Ohanges to equipment aro documented and communiicated.`All,lnc'dentsnear incidents,and unsafe situations re orted. <br />COWAXY CoNFID j� L Tanlmology Ina., 1-008. Al.] Rights Ttcserved <br />rincecl <br />)Pies of this documelit are uncontrolled The euTrmt'version is available in the Tankaolo Un-Line Document Control S st <br />
The URL can be used to link to this page
Your browser does not support the video tag.