Laserfiche WebLink
9 AS <br /> UNIFIED PROGRAM CONSOLIDATED FORMMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-jPaLe 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN E4 2.CHANGE OF INFORMATION 490-I <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> *O*�L,I°�'Y JNPORMATJON. .. <br /> FACILITY ID#(Agency Use Only) t ` <br /> BUSINESS NAME(Same as FACILITY NAME) Ck It ® (A ¢J ^y 3 <br /> BUSINESS SITE ADDRESS -L%A'L 1 103 CITY 1 104. <br /> II.EQUIPMENT TESTING AP VENTIVE,MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): 4990-3b <br /> I M®NITO G LUCATIfJNS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. L1 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o4 <br /> ❑ I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: I& a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> -------------------------------------------------------- --------- ---- - <br /> - - ---------------- ------- ---------------------- <br /> PANEL MANUFACTURER: - 1 MODEL#: t,o 1 490-8 <br /> - ------ - -------- -----------r----------------------ppcc�� ---- -------------------- <br /> LEAK SENSOR MANUFACTURER: (ih ^Q V 490 9 ? MODEL#(S): `1 �j Q° L1 L 0 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-1 I <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> ------------------------------- ---------------------------------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ----------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER490-18 <br /> g.p.h. g•P• (Specify): a90-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> El4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY F1c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑ <br /> 99.OTHER (Specify): 490-26 <br /> 490-27 <br /> .�,PIPE MONITORING IS I'"EkFO EDU iN+G-.THE FULLAD ING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) _/ <br /> SECONDARY CONTAINMENT IS:Va.DRY ❑b.IIQUID FILLED ❑a PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> - ---- -- - - -------------------- ------ --- ------------- - <br /> PANEL MANUFACTURER: til - ►O-'-- - ILS" 490-30 ! MODEL#: l7"L2®J 490.31 <br /> ------------- - --- -------------- ------ - <br /> 490-32 r7 '� 490-33 <br /> LEAK SENSOR MANUFACTURER: V Q 11 d-_ J V -- MODEL 4(S): <br /> 1 �i t{ Q <br /> - - ------- ----------------- - ---------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE SHUTDOWN. Era.YES 0 b.NO 490-34 <br /> AILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 21a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> - PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§_2.36)---- ---� 490-36 <br /> - ----------------------------------------- <br /> MLLD MANUFACTURER(S): P-L Nj t 490-37 MODEL#(S): ,- \V R1 -L t1V V VP-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2634) 490-39 <br /> --ELLD MANUFACTURER(S) 49040 I MODEL#(S): 49041 <br /> -------- ------- ------ - --` --- - - - - - - ------------------ ----- - <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. El 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 49049 <br /> Allowed for monitoring of unburied emergency enerator fuel piping only per HSC§25281.5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)J. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490- <br /> U <br /> UPCF UST-D(12/2007)1/4 <br />