Laserfiche WebLink
• SWRCB, January 2002 <br />6. PEPING SUMP TESTING <br />Page _ of <br />Test Method Developed By: 0 Sump Manufacturer DrIndustry Standard Ou Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />0 Pressure <br />0 Vacuum <br />D Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />&ITT, 1711 <br />Sump Depth: <br />00 6 * Z 1, <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing— <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />AN -1 <br />1 D Yes 0 No 0 N <br />0 Yes 0 No D NA <br />0 Yes 0 No D NA <br />product and water)? <br />Turbine shutdown response time <br />Is system programmed for fail <br />shutdown?' <br />D Yes 0 No 11 NA <br />NTA <br />A <br />OYes ONo DNA <br />Was fail-safe fiedto be <br />■opera,t�io a, <br />a <br />0 Yes El No <br />Wait time between applying <br />test., <br />Test Start Time: <br />Test End Time-: <br />Test Duration.-_ <br />Was sensor removed for testing? <br />0 Yes D <br />g 0 RI <br />31 MCI. <br />0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br />D Yes 0 No 0 NA �j <br />OYes 11 No 0 NA lit <br />a 11 Yes 11 No 0 NA <br />01,=MentS — fiNclude iTfsvdTrr-VAu7 &,Tr rP-,ia4ry wawp -Tri" t4vm. �­F? ­.-A-sr r,. IL.r., .- 'r.- <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must betested. (See SWRCBLG-160) <br />