Laserfiche WebLink
11/3012004 11:05 9163731 b� WALTON ENGINEEJ& PAGE 02 <br />UNDERGROUND STORAGE TANK MONITORING PLAN <br />F'or Ice by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(4)(2), and 2641(h) <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />IO <br />M01 <br />PLAN TYPE R MONITORING iS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M02. <br />Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING LIST,$YSTEM(S): <br />1. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />FACILITY NAME Ronfare Market #35 <br />M03. <br />FACILITY SiTE ADDRESS 15 W. Gralltfille Road 0CITY <br />Tracy <br />Mo'. <br />II- EQUIPMENT TESTINGA.N1) AREVENTIVE.MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e,g„ sensors, probes, line leak detectors, etc.) be performed in <br />"�nr,. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />F <br />MONITORING EQUTPM.NT IS SERVICED ® 1, ANNUALLY (D99.OTHER (Specify): <br />Moi. <br />11I:4- MONITORING .LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and tic locations where monitoring is performed (i,c„ location of each sensor, <br />line Icak detector, monitoring system control panel, ctc,), If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring Systcm Certification <br />form, hazardous Materials Husincm Plan mgp, etc.) which shows all re uircd information, include it with this plan. <br />IV. TANK MONITOWNG <br />MONITORING IS PERFORMED USING THE FOL.i3OWING METHOD($): (Check all that apply) <br />Mtn• <br />® I, CONTINUOUS ELECTRONIC MONITORING OF TANK, ANNULAR (IN3'FRSTTTIAL) SPACES) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAiNMENT iS: R a, DRY ❑ b, LIQUID FILLED ❑ c, UNDER PRESSURE ❑ d, UNDER VACUUM <br />M" <br />PANEL MANUFACTURER; Veeder-Roo M12 MODEL #: TLS 350 <br />M11' <br />LEAK SENSOR MANUFACTURER: Veeder-Root M14. MODEL #(S): 794390-460 <br />MI5. <br />❑ 2, AUTOMATIC TANK GAUGING (AT(3) SYSTEM USED TO MONITOR SINGLE WALL TANK.(S) <br />PANEL MANUFACTURER,- MM, MODEL 1f: <br />M19. <br />IN -TANK PROBE MANUFA(,-rUPER: Min. MODEL #(S): <br />M'"' <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS b. DAILY/NIGHTLY ❑ c. WEEKLY <br />Mao. <br />❑ d, MONTHLY ❑ c. OTHER (Specify); M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h, ❑ b. 0.2 g.p.h, c, OTHER (Specify); M22. <br />M23, <br />❑ 3, IN VbNTORV RECONCILIATION ❑ it. MANUAL PER 23 CCR §2(A6 ® b, STATISTICAL PER 23 CCR §2646,1 <br />M24 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD; ❑ a. 36 HOURS ❑ b. 60 HOURS <br />Mei. <br />❑ S, INTEGRITY TESTING PER 23 CCR $2643,1 <br />TEST FREQUENCY; ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ C. OTHER (Specify): M26. <br />M27. <br />❑ 6,VISUAL.MONiTORiNG DONE: ❑ it. DAiLY ❑ b. WEEKLY (Requirwagancyapprvwl) <br />❑ 99. OTHER (Specify); <br />M2s' <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USiNG THE FOLLOWING METHOD(S) (Check all that apply) <br />Man• <br />® t. CONTINUOUS ELECTRONIC MONITORiNG OF PIPING SUMP(S)/TRENCH(E$) AND OTHER, SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: R a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />Mat. <br />PANEL MANUFACTURER; Ve-ed.er-R Qt M32. moms, #; TLS 350 <br />M33, <br />LEAK SENSOR MANUFACTURER, Veeder^Root M34' MODEL 1f(sy 794380-208 <br />Mas. <br />WILL A PIPING LEAK ALARM TRI(Kjf3R AU`t0MA'rl(: PUMP (i,c.. TURUINE) SHUTDOWN? R a. YES ❑ b. NO <br />M3R <br />WiLL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? R a. YES ❑ b. NO <br />M17 <br />® 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A BEAK. TS I)F-,T sC'i-H0 <br />MLLD MANUFACTURER(s): Mag' MODEL <br />R 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURFR; Y[Q,,?.F.[-RQQt 1 M40' MODEL #; 848480-001 <br />M41. <br />PROGRAMMi5D LINt INTEGRITY TESTS: ❑ a. MiNIMUM MONTHLY 0,2 g,p,h, ❑ b, MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PiPING LEAK TRiGGER AUTOMATIC PUMP SHUTDOWN? R n. YES ❑ h. NO <br />M83 <br />WILL ELLD PAiLUREMISCONNECTTON TRIGGER AUTOMATIC PUMP SHUTDOWN? R a, YES ❑ b, NO <br />M44. <br />❑ 4. INTEGRITY TESTING <br />l'E,S'r FPEQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M4S. <br />M46. <br />❑ S.VISIIALMONITORING DONE: ❑ a. DAiLY ❑ b. WEEKLY* ❑ c, MiN. MONTHLY &EACHTIME SYSTEM OPERATED•* <br />M47, <br />' Rmirw ngtncy approval ^• Allowcd Ibr manitoring nruntmrled emergency gpnerata rite piping only W HSC l;25281.5(b)(3) <br />E]6. PIPING 1S SUCTION PIPING MEETING ALL REQUTREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR RF.,MOTF. FILL PIPiNG iS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />Moa. <br />UN -022A - 115 www.unidocs.org Rev. 10/14/03 <br />