My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 CAL T ESTING <br /> PURPOSE <br /> The Purpose of this reP6;'t- <br /> is to Present the procedures <br /> while conducting The Fire Testing employed and the results obtained <br /> ®f a EVR 11 Vent-line Device Enclosure, <br /> The test is to determine if the sample test Panel can withstand PN F-ENC07. <br /> burning through. and a 2000OF Flame for 2 hours <br /> The test Procedure and results are s <br /> in this report. ummarized starting 011 Page 3 and all data sheets <br /> are included, <br /> nFERENCEs <br /> *These documents were used as references Hot s i <br /> report Only and this <br /> requirements of these specifications. intended to certify to the <br /> *SAE E152 Fire Test of door assemblies <br /> *ASTM E814 Fire Tests of through penetration fire stop, <br /> 9 <br /> ANSI/NCSL 2540-1 calibration Systems Requirements <br /> ISO/IEC 17025- General Requirements <br /> Testing Laboratories. for the Competence of Calibration and <br /> Tested By: Gary Cardinal, Revision Date <br /> NC Customer P0# TR3�417 <br /> Written By: Robert Bouvier 12-16-08 Verbal <br /> Socal Testing Job# <br /> 3417 Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.