My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOCAL TTIESTING1 <br /> 71ST MATRIX <br /> The following table sumrnari2es the testing and test results. <br /> Fest Results Summary <br /> Fest Description <br /> Fest Procedure Paragraph SUAVVIARY <br /> Fixe'fest ,:����,,, �.: <br /> See test Started Cry®m let <br /> Sam les: IS le st � �xr,�.� � ed estrus <br /> descri tion 12-12-08 12-12-08 <br /> Pass <br /> TEST PRoCEDURES AND <br /> METHOD <br /> FIRE TEST <br /> The test specimen was tested by subjecting <br /> hours. ng the 2 hours the panel was ° the panel to a 2000°F flame, 7 inches in diameter for two <br /> Without burning through to the Opposite suspected to determine if the panel could withstand the flame <br /> Flame Temperature: 2000°F+/- 150-F along the centerline of the flame <br /> inches. The flame temperature was measured in accordance with ora for a minimum <br /> Five(5) Thermocouples were evenly spaced formin Paragraph 2.5 of SAE distance 377Re 6 <br /> specified temperature exists along the entire surface of the <br /> rake along the centerline of the flml to insure e <br /> measured 4 inches from the end of the barrel extension. <br /> unit being tested. The flame to <br /> was <br /> Flame nter�sity' e flame heat content was verified to meet the requirement input to a 15 inch exposed length of t inch as 0.032 inch wall copper to <br /> The calibration procedure was performed h accordance with Paragraph q ement of 4500+200 -100 Btu/hr. <br /> average difference in water temperature from inlet to Outlettubing with water flow of 1 <br /> p aph 3.2 of SAE 1377 R'V,A. <br /> Themultiplied by the rate of water flow(approx. SOOIbs/hr over a 3 �. The <br /> rntnute period. The average delta T <br /> equaled the intensity of the flame in Btu/hr. <br /> The test unit was mounted horizontall <br /> y.Aft <br /> toward the panel at a distance of 6 inchesfrom theer endofofgthe outthe let. I conditions the flame was <br /> he Flame was applied for 2sfloursitioned <br /> Tested 13y; Clary Cardinal, <br /> Revision Date <br /> Customer PC)# <br /> Written By. Robert Bouvier NC 12-16-08 Verbal T83-4l7 <br /> Socal Testing Job# <br /> 3417 Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.