Laserfiche WebLink
R <br /> D <br /> Changed P/Y De <br /> I ajuw� OVW�td Ph—I 1/v V �qciiptfo, T. Rate man 11/13/08 <br /> ?/V d.(fbf av <br /> P14.I <br /> -Uff-d M.. <br /> 12 <br /> wa Fmcnw, <br /> V.Po Reivm vapor wa FML,,W� A <br /> Air 0ukw VaPnr ReFum VaporCC A <br /> 'Rip OdQ. <br /> Detail 'A' Rob Qcr�„ <br /> Detail 'a' <br /> Detail 'C' <br /> Flexible <br /> cOnnectiOns between the Processor <br /> red by the local Ives and the vent(s) <br /> I <br /> required utlicir-fty having jurlsdiation to <br /> le' connections be installed that is <br /> back meet Seismic requirements is allowable if <br /> to the Vent(s) shall be greater thanOt supported, the slope of the flexible <br /> co'hou'd the <br /> n 1/g" Per foot, nriections <br /> Q) 16 WARNING: The Air 0.jj,t riser <br /> 4 WARNING: (#I) Out of the Processor MUST NEVER be mcnIfOlded together with <br /> The two vent risers that connect to the Processor MusT NEVER 6 other vent rhs=, <br /> as this will short circuit the <br /> processor, 0 manifolded together, <br /> V` Detail "A" shows G two vent riser configuration. <br /> can not be 19ur0tiOn. Manifolding of the vent riser-9 #2 <br /> Detail allowed, as this Will short circuit the Processor. & #3 at the P/V ,I,, ER <br /> "a" 'shows a three vent riser configuration. Two Of the vent risers May be manifolded <br /> at the P/V valve <br /> as shown with #2 and #3 <br /> connected. <br /> Detail <br /> valve as shown with #2 and Emissions Control system 121 <br /> rr, show, ❑, four vent riser configuration. The vent risers ma manifold at the P/,V Q) <br /> ECS Vent R, <br /> cOnnected, 'I'd 04 and #5 connected, r Conflqurot�oris <br /> none <br /> 5561-001 D <br />