My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> FORM 1: VEEDER ROOT <br /> DATE OF TEST: ' VAPOR POLISHER HC EMISSjoiqS TEST <br /> SERVICE COWIPAHV NAME SERVICE COMPANY'S TELEPHONE <br /> SERVICE TECHMICIAN VEEDER-ROOT TECH CERTIFICATION*(as aPPlicable) <br /> 'CC Or DISTRICT TRAINING CERTIFICATION; (as aficable) <br /> STATION NAM <br /> DISTRICT PERMilT# <br /> STATION,;ADDRESS <br /> CITY <br /> STATE ZIP <br /> STEP 6. CAL GAS DOCUMENTATION ?ATTACHED2 HC ANALYZER ZERO CHECK READING: <br /> 6.3 HC A14ALYZER CAL,CHECK READING: <br /> IS IE ZERO READING <br /> IS THE CAL CHECK RE '< 0�I% By VOLUME? <br /> ANALYZER Yes iNgo <br /> (IF NO: THE HC ANALY ADING BETWEEN 0.8%AMID 1.0%? Yes No <br /> MUST BE RE-CALIBRATED.) <br /> STEP 6.5 3-IA'Ay VALVE IN CORRECT POSITION (PER <br /> FIG. 1)? <br /> 6.6 PiAC VALVE MODE SET To I�' —M <br /> iANUAL OP ? <br /> STEL T 1 START ❑ <br /> FLOW RATE, END FLO'w RATE: <br /> HC READING AT 3 MIN: <br /> PC READING AT 4 MIN- <br /> 1 C READING AT 5 IN: <br /> STEP 7.3 HC READING AT 6 MIN: <br /> Is THE HC comc <br /> (IF NO: THE VR - ' 0.9% By VOLUME FOR ALL READING3?Yqs 00 , <br /> POLISHER IS NOT IN COMPLIANCE WITH THE HC EMISSION <br /> REQUIREMENTS OF EXHIBIT 2,) <br /> STEP 7.5 <br /> 3®4 'AY VALVE SET TO NORMAL OPEN POSITjOf'!? <br /> (UST Ullage to Vapor pollsher) <br /> �_ U"age lor Po 1) <br /> RE-SET VP,,pOR VALVE TO AUTOiWATIC MODE? <br /> VAu El <br /> VST Phase it EvR System, Exhibit 12- VR-203-E and VR-204-E <br />
The URL can be used to link to this page
Your browser does not support the video tag.