Laserfiche WebLink
MONIT(WING SYSTEM CERTINWATION <br />CERTIFICATION /TEST DATE: December 17. 2007 <br />A1. FACILITY <br />Yes <br />❑ <br />A2. OWNER <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Name <br />Bonfare Market # 35 <br />❑ <br />Name <br />Bonfare Markets, Inc. <br />Address <br />15 W. Grant Line Road, Tracy, CA 95376 <br />❑ <br />Address <br />461 S. Milpitas Blvd., Suite 1, Milpitas, CA 95035 <br />Phone # <br />209-833-9619 <br />❑ <br />Phone # <br />408-933-4422 <br />Contact <br />Les McCloud <br />❑ <br />Contact <br />Sean Kapoor <br />F. IN -TANK GAUGING / SIR EQUIPMENT: <br />■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 <br />