My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITWING SYSTEM CERTIIWATION <br /> CERTIFICATION /TEST DATE: December 16, 2009 <br /> Al. FACILITY A2. OWNER <br /> Name Bonfare Market#35 Name Bonfare Markets, Inc. <br /> Address 15 W.Grant Line Road,Tracy,CA 95376 Address 461 S. Milpitas Blvd.,Suite 1,Milpitas,CA 95035 <br /> Phone# 209-833-9619 Phone# 408-933-4422 <br /> Contact Danny Arcayena Contact Sean Kapoor <br /> F. IN-TANK GAUGING/SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No- Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ N/A (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ■ N/A <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ■ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> ©2006 Walton Engineering,Inc. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.