My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, LIDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Monitoring System "Cold Start" as a result of the EVR/ISD Phase II Upgrade. <br /> We will be installing a new ECPU board in the existing VR monitoring <br /> console. Additional vapor system system work will consist of new dispenser <br /> hanging hardware, new vapor flow meters, a vapor pressure sensor, and the <br /> vapor polisher unit . We expect this work to require 4 days, with the <br /> monitoring Certification on the 4th day. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> See attached. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.