Laserfiche WebLink
0 <br /> ENEDMonitoring System Certification R11Decov/ <br /> D. Results of Testing/Servicing 0 1-J' 2 4 Z 01 <br /> Software Version Installed: 329.01E 1::NVILN' NMr_1,A_'Fi`L HEALTH <br /> Complete the following,checklist: D E PA R T N F <br /> • Yes F No* Is the audible alarm operational? <br /> • Yes F No* Is the visual alarm operational? <br /> • Yes F1 No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes F No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> El Yes F No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modern) <br /> Z N/A operational? <br /> Z Yes El No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> F N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Z Sump/Trench Sensors; Z Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Z Yes; El No. <br /> E] Yes F No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> 0 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> El Yes* Z No Was any monitoring equipment replaced? If yes, identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> E] Yes* Z No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> El Product: 0 Water. If yes, describe causes in Section E,below. <br /> • Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Yes E] No* 1 Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Mechanical overfill prevention valve is installed in each fill riser.Veeder Root 794380-208 sensor <br /> is installed into Vent Sump -proper opearation was confirmed. <br /> Page 2 of 4 <br />