Laserfiche WebLink
Monitoring System Certification eao� <br />6C4_*"C0MN1 WGH <br />UST Monitoring Site Plan <br />Site Address: 15 E. Grantline Rd., Tracy, CA 95376 <br />...................... ......... <br />D�-LS 3fb <br />. . . . . . . . . . ...... . . ... . . . . ' <br />. . . . . . . . . . . . . . . . . . . . . . . . . . Ca,JF. . . . . . . <br />O.IG <br />. . . . . . . . . L . . . . . . . . . . . . . . ... .S vN <br />p . . <br />�=. <br />Date map was drawn: 12/16/2010. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page 4 of 4 <br />. . . . . <br />. .'t-i`'Z. . . . . . . '' <br />SUMP <br />. . . <br />. . • • <br />. . . . . . . . . . <br />.. If`NY� . . . . . . . . . . . . . . . . . . . . <br />. . <br />. <br />. . . . . . <br />�'L�- . . . . . . . . . <br />............ <br />. .. <br />. . . . . . . <br />... <br />. . .,-.1 <br />..... <br />... <br />..... <br />& . <br />... <br />................ <br />. . . . . . . . . . . . . . . . <br />11. <br />Ul..... <br />... <br />.... <br />..... <br />... <br />................ <br />Q.......... <br />... <br />..... <br />... <br />..... <br />... <br />................ <br />............ <br />.. <br />... <br />... <br />..... <br />..... <br />... <br />... <br />..... <br />�tll... <br />... <br />... <br />................ <br />................ <br />....... <br />+1 LU , <br />Svi-tP <br />.. .:. . .. ..... . <br />.®. <br />....... <br />sv .. <br />lr <br />................ <br />. <br />•...... <br />... <br />. . <br />..... <br />. <br />................ <br />... <br />........ . . . . . . ►-�VI_A1Z_.sizNS®e. . . . .... . . • • . • . • .... . <br />.. <br />..................UDC <br />iv +i. ..................... <br />... <br />..........L ---I.. <br />... ................. <br />..: <br />..........�o /�... <br />��� �,�....... ��Z ............... . <br />Date map was drawn: 12/16/2010. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page 4 of 4 <br />