My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 3:00:37 PM
Creation date
6/23/2020 6:47:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\PERMANENT INJUNCTION & FINAL JUDGMENT 1-15-10.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification eao� <br />6C4_*"C0MN1 WGH <br />UST Monitoring Site Plan <br />Site Address: 15 E. Grantline Rd., Tracy, CA 95376 <br />...................... ......... <br />D�-LS 3fb <br />. . . . . . . . . . ...... . . ... . . . . ' <br />. . . . . . . . . . . . . . . . . . . . . . . . . . Ca,JF. . . . . . . <br />O.IG <br />. . . . . . . . . L . . . . . . . . . . . . . . ... .S vN <br />p . . <br />�=. <br />Date map was drawn: 12/16/2010. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page 4 of 4 <br />. . . . . <br />. .'t-i`'Z. . . . . . . '' <br />SUMP <br />. . . <br />. . • • <br />. . . . . . . . . . <br />.. If`NY� . . . . . . . . . . . . . . . . . . . . <br />. . <br />. <br />. . . . . . <br />�'L�- . . . . . . . . . <br />............ <br />. .. <br />. . . . . . . <br />... <br />. . .,-.1 <br />..... <br />... <br />..... <br />& . <br />... <br />................ <br />. . . . . . . . . . . . . . . . <br />11. <br />Ul..... <br />... <br />.... <br />..... <br />... <br />................ <br />Q.......... <br />... <br />..... <br />... <br />..... <br />... <br />................ <br />............ <br />.. <br />... <br />... <br />..... <br />..... <br />... <br />... <br />..... <br />�tll... <br />... <br />... <br />................ <br />................ <br />....... <br />+1 LU , <br />Svi-tP <br />.. .:. . .. ..... . <br />.®. <br />....... <br />sv .. <br />lr <br />................ <br />. <br />•...... <br />... <br />. . <br />..... <br />. <br />................ <br />... <br />........ . . . . . . ►-�VI_A1Z_.sizNS®e. . . . .... . . • • . • . • .... . <br />.. <br />..................UDC <br />iv +i. ..................... <br />... <br />..........L ---I.. <br />... ................. <br />..: <br />..........�o /�... <br />��� �,�....... ��Z ............... . <br />Date map was drawn: 12/16/2010. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.