Laserfiche WebLink
eas� <br />ECO CHI K COMPUAKOE <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />t_ FACILITY INFORMATION <br />Facility Name: Bonfare #35 1 Date of Testing: 12/16/2010 <br />Facility Address: 15 E. Grantline Rd., Tracy, CA 95376 <br />Facility Contact: Sean Kapoor I Phone: (209) 833-9619 <br />Date Local Agency Was Notified of Testing : 11122/2010 <br />Name of Local Agency Inspector (fpresent during testing): Thuy Tran <br />Company Name: ECO-CHEK Compliance <br />Technician Conducting Test: Nikola Zagorov <br />Credentials': ❑ CSLB Contractor ® ICC Service Tech. ® SWRCB Tank Tester ❑ Other (Specie) <br />License Number(s): 09-1748 <br />Z gPTT.T. RITC YCET TF.gT1Nf_ INFnRMATInN <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: Tape Measure <br />Equipment Resolution: 1/16 Inches <br />Identify Spill Bucket (By Tank 1 Super <br />Number, Stored Product, etc) <br />2 Regular Syphon <br />3 Regular <br />4 <br />Bucket Installation Type: <br />❑ Direct Bury <br />® Contained in Sump <br />❑ Direct Bury <br />® Contained in Sump <br />❑ Direct Bury <br />® Contained in Sum <br />❑ Direct Bury <br />❑ Contained in Sum <br />Bucket Diameter: <br />12 Inches <br />12 Inches <br />12 Inches <br />Bucket Depth: <br />12 Inches <br />12 Inches <br />12 Inches <br />Wait time between applying <br />vacuum/water and start of test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time (Tj): <br />10:10 AM <br />10:10 AM <br />10:10 AM <br />Initial Reading (RI): <br />10 7/8 Inches <br />10 1/2 Inches <br />9 1/2 Inches <br />Test End Time (TF): <br />11:10 AM <br />11:10 AM <br />11:10 AM <br />Final Reading (RF): <br />10 7/8 Inches <br />10 1/2 Inches <br />9 1/2 Inches <br />Test Duration (TF — T,): <br />60 Minutes <br />60 Minutes <br />60 Minutes <br />Change in Reading (RF - RI): <br />0 Inches <br />0 Inches <br />0 Inches <br />Pass/Fail Threshold or <br />Criteria: <br />1/16 Inches <br />1/16 Inches <br />1/16 Inches <br />`I`est, Result: <br />0 Pass . ' Q Fail <br />Z1, Pass; []. <br />]Fail <br />® <br />. Pass Q Fail <br />Q . Pass El Fail' , <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature:r ov Date: 12/16/2010 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />