My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:47:58 PM
Creation date
6/23/2020 6:47:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br />Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: • Pressure o Vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />Descrintion Line #1 Line #2 Line 93 <br />Tank product <br />Gasoline - 87 <br />Gasoline - 89 <br />Gasoline - 91 <br />Pipe manufacturer <br />Smith <br />Smith <br />Smith <br />Pipe material <br />FRP <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2" <br />2" <br />2" <br />Secondary pipe diameter (inches) <br />3" <br />3" <br />3" <br />Method of secondary pipe isolation <br />Clamshell <br />Clamshell <br />Clamshell <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />70' <br />70' <br />80' <br />(include length of branch runs) <br />`< 0.5 <br />0.5 <br />0.5 <br />Comments: <br />© 2004 Walton Engineering, Inc. <br />Wait time for pressure to stabilize (hr:min) <br />0:10 <br />0:05 <br />0:12 <br />Test start time <br />10:10 AM <br />9:30 AM <br />9:37 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />11:10 AM <br />10:30 AM <br />10:37 AM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />0.0 <br />0.0 <br />Pass/Fail threshold (psig) <br />`< 0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />Comments: <br />© 2004 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.