Laserfiche WebLink
Monitoring System Certification <br />Site Address: 15 j Z//v(yI ns. Date ofTesting/Servieing: <br />F. In -Tank Gauging/ SIR Equipment: CR Check this box if tank gauging is used only for inventory controL . <br />❑ Check this box if no tank gauging or SIR equipment is ins=-lled- <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring_ <br />Complete the following checklist: <br />Yes' <br />❑ No* . <br />Has all input wiring been inspected for proper entry and including testing for ground faults- <br />❑ Yes <br />[133 <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue bur�dup? <br />Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />Yes <br />❑ No; <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes.reinstalled properly? - - <br />.Yes - <br />❑ No* <br />Were all items on the equipment man s maintenauce:checklist completed? <br />In the Section K. below, describe howand when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Chock this box if LLDs are not installed. <br />Complete the following checklist:: <br />O - Yes <br />i ❑ Nd* <br />For equipment start-up or annual: equipment certification, was a leak*simulated to verify LLD performznce? <br />' <br />-❑. NIA <br />(Checktrll that,apply) Simulated leak rate: ❑ 3-g phi; ❑ 0.1 g p h?; ❑ 02 g_p.h.Z . <br />Notes. L Required for equipment start-up certification and annual certification. <br />-2 - Unless mandated by local agency; ce tificationyoquired only for electronic LLD start-up, <br />❑ -Yes - <br />Cl No*• <br />Were all U.Ds confirmed operational and accurate within -regulatory requirements? <br />❑ Yes <br />Ll - No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />Foc mechanical LLDs, does the LLD restdct product flow if it detects a leak? <br />❑ NIA <br />❑ . Yes <br />❑ No* <br />Torelectronic LLDs, does the turbine automatically shut off if the LLD detects a icak? <br />❑ NIA <br />❑ Yes ' <br />a No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of lite monitoring system is disable <br />❑ NIA <br />or disconnected? <br />❑ Yes <br />❑ "No*. <br />.For electronic LLDs, does the. turbine automatically shut off if any. -portion of . the -monitoring. sti•stem <br />❑ N/A <br />malfunctions or fails a test? - <br />❑ Yes <br />❑ Nos <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ NIA <br />❑ Yes, . <br />❑ No* <br />-Were all items .on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H. <br />below. describe how and when these deficiencies were or will be corrected. <br />IL Comments: <br />