Laserfiche WebLink
i <br /> DESIGNATED UNDERGROUND STORAGE TANK (UST) OPERATOR <br /> MONTHLY VISUAL INSPECTION CHECKLIST <br /> Facility Name Quik Stop Market#138 Date April 8, 2014 <br /> Facility Address 1153 Lincoln Blvd. <br /> City,State,zip Tracy,CA 95376 <br /> Designated Operator Culp,William <br /> ICC Gerlification# 8251286 Expiration March 18,2016 <br /> Signature , ?,,;�� i- -4 Phone (916)826-3066 <br /> Item MONITORING PANEL-/ ALARM HISTORY _Y N NA <br /> 1 Monitoring system is powered on and in proper operating mode. ■ ❑ ❑ <br /> 2 Monitoring system is NOT currently showing any alarms or warnings. ■ ❑ ❑ <br /> 3 Alarm history report/tog for the previous month is available,and has been reviewed by the Designated UST Operator. ■ ❑ ❑ <br /> 3a Is a copy of the alarm history report/log to this form? ■ ❑ ❑ <br /> 4 Each alarm for the previous month has been responded to appropriately. ❑ ❑ ■ <br /> 5 Sensors located in tank-top containment sumps have NOT alarmed in the past month. ■ ❑ ❑ <br /> 5a List all tank-top sumps where alarms occurred in the past month: <br /> r <br /> Note: Sumps where an alarm has occurred in the past month must be inspected unless a quahtied service technician responded to,and <br /> properly addressed,the cause o/the alarm. Attach documentation verifying appropriate service to this report. t <br /> If suMe i Ghon is re wired,record results in item 6 below. f <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note: visual inspection of sumps is only required in sumps are an alarm has occurred in the past month for which there is no service record. <br /> YN <br /> Sump Location: ❑ ❑ <br /> Sump Location: ❑ ❑ <br /> Sump Location: — _ ..0. -0- <br /> 7 <br /> 0 7 Spill Containment Structures are free of water,debris, <br /> and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1 - Gasoline 87 ■ ❑ ❑ Tank 3 - Gasoline 91 ■ ❑ ❑ <br /> Tank 2 - Gasoline 89 ■ ❑ ❑ <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Y N NA <br /> Dispenser 1/2 ■ ❑ ❑ <br /> Dispenser 3/4 ■ ❑ ❑ <br /> PAPERWORK INSPECTION Date I Y I N I NA <br /> 9 Monitoring system certification has been completed within the past 12 months. 08/23/13 ■ ❑ ❑ <br /> 10 Secondary containment tests have been completed within the required timeframe. 07/25/13 ■ ❑ ❑ <br /> 11 Spill containment structure(bucket)testing was completed within the past year. 08/23/13 ■ ❑ ❑ <br /> 12 Tank tightness testing was completed within the required timeframe. ❑ ❑ ■ <br /> 13 Line tightness testing was completed within the required timeframe. ❑ ❑ ■ <br /> 14 Other required testing/maintenance was completed within the required timeframe. (List items below) <br /> Test/Maintenance Air Quality Test 09/05/13 ■ ❑ ❑ <br /> Test/Maintenance ❑ ❑ ❑ <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> .mm <br /> I 15 All facility employees have received the required on-the-job training within the past year. ■ ❑ ❑ <br /> 16 All facility employees hired within the past 30 days have received the required on-the-job training. 101 ❑ ■ <br /> 02014 W",-..,_ Page 1 Checklist P1 <br />