My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 4:40:01 PM
Creation date
6/23/2020 6:47:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_2017-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />CV <br />O <br />Of <br />d <br />L <br />O <br />U <br />a� <br />ti <br />O <br />N <br />0 <br />rEn UNDER <br />MONTHLY' <br />lulk Stop Market 0138 <br />153 Lincoln Blvd, <br />racy, CA 95376 <br />a <br />tifd alari oar montor <br />5 <br />..tt�ll i'IrI- "71 I!1 /A lne pall m4n(n mVS. D in <br />SFC <br />propedy addressed. the cause o/ fhe alarm. Altach tlotunren7ar�on <br />+e <br />', <br />.. - f7 s o rnspecf o rs required n:coN resWfs rn item 6, below <br />____�. <br />UST SYSTEM INSPE <br />Tarin conla,nmeol sumps are free of water. debris, and haz <br />Nofe. V., Uaf inspection ,fps, only,qu red m somas were an a <br />Y <br />Sump Location: ❑' <br />Sump Location <br />Sump Location" <br />Spilt Containment Structures are free of water, debris. an - <br />us sot <br />N� <br />€ El A <br />Tank 1 - 87 <br />Tank 2 - 89 <br />areas a, lwater; <br />haza r <br />.j N <br />Jpnsere <br />r 1/2� <br />Ell,` <br />3/4 <br />i <br />• <br />9 Monitoring system certification has been completed within the past 12 monitf, <br />10 Secondary containment tests have been completed within the required timeframe <br />11 Spill containment structure (bucket) testing was completed within the past year. <br />12 Tank tightness testing was completed within the required timeframe. <br />13 Line tightness testing was completed within the required timeframe <br />I r skier required testingmaintenance was completed within the required timeframe. (List items below <br />a ; Maintenance Air Quality Test - - <br />i t arntenarse - — -- -- - <br />I <br />EAC(LITY EMPLOYEE TRAINING <br /><_rr , , yee-- r�. ,� e� e, the required on the -soh frac , hfn the_ p2.,: year <br />- s <br />All e^ 1 Fn v.r,:r, the past 30 days nave received the re ulna cn-th ob a <br />- - <br />Page 1 <br />08/16116 <br />P1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.