Laserfiche WebLink
Zuna J. Barker [EH] <br /> From: Roger Batra <Roger.Batra@quikstop.com> <br /> Sent: Thursday, August 9, 2018 12:01 PM <br /> To: EH-UST;Zuna J. Barker [EH]; Garrett Backus [EH] <br /> Cc: Sam Alkoussa; Cesar Bosano; Deborah Markovich;veronica.f@waltonengineering.com; <br /> Kevin Hess <br /> Subject: FW: <br /> Attachments: 1153 Lincoln Blvd, Tracy 2018 inspection Report.pdf, 20180809114421357.pdf <br /> Zuna, <br /> In response to the UST Program Inspection Report dated August 7, 2018, the following actions were taken: <br /> Item #104: The tank information has been corrected in CERS. <br /> Item #107: The piping layout map is been prepared by Walton Engineering. Upon receipt it will be included <br /> in the Monitoring Plan and submitted in CERS. <br /> Item #121: No response required. <br /> Iem #201: The financial responsibility documents were submitted in CERS. A copy has been placed in Tab 6 of the Blue <br /> UST Volume I Binder at the facility. <br /> Item #209: Walton Engineering (Designated Operator) has been instructed to ensure that all testing and maintenance <br /> dates are entered correctly. <br /> Iem #211: Walton Engineering has completed the D.O. training for all employees (see attached). <br /> Item #308: Corrected at the time of inspection. <br /> Item #315: Quik Stop Markets will schedule the removal of liquid in the 87, 89, and 91 product fill sumps and dispose of <br /> the liquids properly. The manifests will be sent to you upon receipt from the contractor. <br /> Item #318: Corrected at the time of inspection. <br /> The Return to Compliance certification is signed and dated. <br /> Thanks, <br /> Roger Batra <br /> Director of Environmental Affairs <br /> 510-445-2285 <br /> PLEASE FORWARD TO ZUNA BARKER <br /> Roger Batra <br /> C-Store/DIR Fuel Compliance <br /> E: Roger.Batra@quikstop.com <br /> Quik Stop Markets Inc <br /> 4567 Enterprise Street <br /> 1 <br />