Laserfiche WebLink
Alk A& <br /> NIFIED PROGRAM CONSOLIDATED FOR <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> } tr r7i e3a l t t,rp" I,, t��g'�71�7i1�+D t+pL+*{` g�,/�/� pgEl1IT <br /> 4ss.,s'�` 3. +F�ei .,`P, r. .;®,i�41J17fJ,4'!d94D�r3S;--T;,,{,,, �i16�6JVN�.: k°s , <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-548 <br /> 490.546 <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): _ <br /> PANEL MANUFACTURER: Beaudreau a90-ss MODEL#: TLS-350R 490 56. <br /> LEAK SENSOR MANUFACTURER: Beaudreau 490-57 MODEL#(S):406/508 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN N a.YES ❑b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 19 a.YES b.NO 4`0"61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS ®1.SINGLE-WALLED ❑ 2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1.LIQUID [12.PRESSURE ❑3.VACUUM_ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> 0'v <br /> ., Yi.'.t}, tR �'}P'. ,a4$>,'e .�,.' '•r z,f�1t��;E.. � ��:,:"z.. •.�YY�I�jF�l�$®DIC,PDHN�EI9R`; Et7,i;1�G <br /> t <br /> LJ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTI N ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23CCR 2644.1 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. _ 490-67 <br /> t ;qq <br /> r t r>•'ni Rj Ye,Tn[`hklitt� t}:f d ,lad±Y3l inti r F y?�2 ir,Y,11I':'HWI.ORD IW_ ErIN'G •`` i i , Itt r t C P <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-68a ❑Visual Inspection Records 490-696 ❑Tank integrity testing results 490-69c <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).490.68f ❑ Corrosion Protection 60-day logs 490-68g <br /> ®Equipment maintenance and calibration records. 490.68h <br /> y t7 <br /> k <br /> E �t *, � ,'s �r•, ! 0-S u.atU rlc�,.a .' ,7<rs�s` ._ t v,,- , <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY,'(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49°-696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69S <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> A Operation of the UST systems in a manner consistent with the facility's best management practices <br /> A The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> 3' sMON,Xlrt'00—1VIRTS <br /> - - <br /> �ADDITIONAli;INTURMATIUN„ <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-7P <br /> Fill Sump Sensors:Veeder Root 794380-208 $7 f 41 -ru"Me, Sti'"rs- have. 3S2 Se•+c®®a <br /> Overfill Protection:Dro Tube Fla er J)SL 54 To4r6ne Su s, Hav< tog Spmccws <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Javier Arellano 490-72 TITLE MANAGER 490-73 <br /> NAME Steve Darretta 490-74 TITLE General Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up alction. <br /> 7.fS r4 iJ i <br /> CER FI ON:I certify that t4e inforiT(atigii provided herein is true and accurate to the best of my knowledge. <br /> LIC GNATU 490-76 DATE: 490-77 <br /> January 5,2010 <br /> 1.A&ahgdMd v g[QWM <br /> APPLIC T NAME(print 490-78 APPLICANT TITLE: 490-79 <br /> Aura Sibley for Shell Oil 4ducts I HS&E Compliance Coordinator <br /> UPCF UST-D(12/2007)2/5 <br />