Laserfiche WebLink
SWItCB,January 2002 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill!0verfill Containment Boxes 11 <br /> Spill/overfill Containment Boxes are Present,but were Not Tested <br /> Fest Method Developed By: ❑Spill Bucket Manufacturer E]Industry Standard ElProressional Engineer <br /> ❑Other(S1.7eciji)F— I <br /> Test Method Used: El Pressure El Vacuum E]Hydrostafic <br /> D Other(Sped U.y)= I <br /> Test Equipment Used: Equipm ent Resoluti-oni <br /> Spill Box Spill Box Spill Box#L—..—ISpill Box# <br /> Bucket Diameter: <br /> Bucket.Depth: <br /> Wait time between applying <br /> pre ssu rc/vacutj ni/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> I-Change in Reading(R�-Rj): <br /> Pass/Fail Threshold or <br /> CTest Result:riteria: []Pass []Fail []Pass 0Fail E]Pass E]Fail []Pass []Fail <br /> Not Tested[] Repairs Made Not Tested 0 Repairs Made Not Testred Repairs Made E] Not Tested[]Repairs Made CLJ <br /> COMMentS—(inchule information on repairs made prior to testing,and i-ecottimeikicd,li)lloii-ul),Ii)r,faile(.1 tests) <br /> Per inspector Ruvalcaba the spill bucket does not need to be tested as it was recently tested during <br /> the site certification and passed, <br /> -T� Fi <br />