Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sogov.org/ehd <br /> ANP 'M <br /> Report <br /> O'M <br /> Facility Name: Facility Address: Date: <br /> Frontier California Inc.: Manteca CO 430 W Center St, Manteca August 03,2017 <br /> -Al <br /> _ .. [!$T Sysem06servataons <br /> 323 HSC 25283.5(a) Unburied below grade UST system failed to meet exemption status c V u R Ei COS <br /> 324 CCR 2717.1(g) Tampered with red tag o V o R o COS <br /> 325 CCR 2717.1(f) Deposited petroleum into a red tagged LIST o V ii R o COS <br /> 326 HSC 25299(a)(9) Tampered with or disabled leak detection devices or alarms o V Li R Li COS <br /> 327 CCR 2631.1 UST system not compatible with the substance stored c V ii R o COS <br /> 328 HSC 25298 Failed to comply with temporary closure requirements ci V c R o COS <br /> 329 HSC 25298 Failed to comply with permanent closure requirements Ei V o R o COS <br /> 330 CCR 2636(f)(6) Failure to meet all requirements in lieu of a line leak detector for emergency generator tank system c V o R o COS <br /> Phk <br /> 401 CCR 2636(a)(3) Suction piping not properly sloped or incorrectly located check valve o V ii R c COS <br /> 402 CCR 2643(d) Daily monitoring of suction pipe(pre-Jan 1984)not performed o V o R ri COS <br /> 403 CCR 2643(d) Triennial 0.1 gph line test for conventional suction piping not performed(pre-January 1984) o V o R o COS <br /> 404 CCR 2643(e) Biennial 0.1 gph test for gravity piping not performed(pre-January 1984) ci V o R o COS <br /> V <br /> '7 <br /> 2010 See below Unlisted Administration/Documentation violation o V Ei R o COS <br /> 2030 See below Unlisted Operations/Maintenance violation o V o R o COS <br /> 2060 See below Unlisted Design/Construction violation o V r3 R c3 COS <br /> MY O n' W_ <br /> is <br /> 10 <br /> LAT N Y' <br /> a <br /> N <br /> (CLASS CLAS �t om <br /> �s g» <br /> Item#I— Remarks <br /> I <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator at the time of inspection. The EHD will generate <br /> and provide a complete report to the facility operator. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: August 03, 2017 Inspector: Inspector Phone: <br /> UW/ Printed Name and Title: JOHN ALANIZ, EFIS Trainee (209)468-3147 <br /> David Smith, Designated Operator <br /> FA0003838 PR0231425 SCO01 08/03/2017 <br /> EHD 23-01 Rev.09/22/16 Page 3 of 3 Underground Storage Tank Program OIR <br />