My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />1. The existing generator enclosure has a very small day tank that transfers the fuel <br />between the generator and the existing double wall underground tank. This day tank <br />will also be removed along -with the generator and the enclosure. <br />existing double wall fuel lines from the underground tank come inside the <br />• in a vault/trench. <br />3. We will be constructing an enclosed metal cover at the trench/vault where the <br />existing fuel lines come through the ground and concrete side wall of the trench/vault <br />to keep rain water out. <br />5. New fuel lines will be connected to the (2) existing fuel lines, 1 supply and 1 return, <br />in the vault. New pipes will be 90'd up and go through field fabricated vault lid. <br />Pipes to be connected to a new 275 gallon outdoor •r tank that would transfer he fuel <br />between the existing underground double tank and the new generator. <br />6. The new fuel line which will all be above ground can be single wall black iron pipes, <br />as allowed by code. <br />7. The Plumbing drawings should indicate our intention to comply with code required <br />fuel. leak monitoring. <br />8. , The vault being affected will be liquid tested after work is completed to ensure thrA <br />the vault does not leak. <br />SEP 0 1 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.