Laserfiche WebLink
August 26, 2015 <br />MARK CRISP <br />PC INC <br />PO BOX 2116 <br />NIPOMO, CA 93444 <br />• <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: VERIZON CALIFORNIA; 430 W CENTER ST, MANTECA, CA 95336 <br />FILE COPY <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />SR0071950 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to 1) remove the existing day tank, the generator and the enclosure <br />(and replace with a new generator and a day tank), 2) modify the sidewalls of the existing <br />concrete transition sump and construct a metal transition sump cover, 3) install a new 275 <br />gallon outdoor day tank and a generator, 4) remove the fuel polisher and all associated <br />underground piping, 5) remove the sump penetration where the fuel polisher line entered the <br />tank top sump and repair the sump penetration opening using the BRAVO FRP-KIT-407 repair <br />kit on the underground storage tank (UST) system at the above noted address. According to <br />Mark Crisp with P.0 Inc, the fuel flexible lines (between the polisher and the UST) will be <br />removed without breaking of the concrete. <br />The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in the scope of work must be submitted to the EHD for approval <br />prior to commencement of work. <br />3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments): <br />a. Sampling: Witness the associated soil sampling and grouting of soil borings (per <br />SR0072926 and SR0072925), receive laboratory analytical results, receive all <br />appropriate waste disposal documentation, including the rinsate hazardous waste <br />disposal record. <br />b. Witness 24hr. lake test or equivalent on the diesel tank top sump and diesel <br />transition sump. <br />c. Verify drainage of secondary line into the tank top sump and transition sump. <br />Please be aware that the facility cannot receive fuel in the tank prior to the EHD <br />inspection and approval. <br />