Laserfiche WebLink
SWRCB,January 2002 Page of /0 <br /> T. UNDER:DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method.Developed By: X UDC Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Incon Equipment Resolution: <br /> UDC#j UDC# UDC# UDC# <br /> UDC Manufacturer. <br /> UDC Material: <br /> UDC Depth: a �i <br /> Height from UDC Bottom to Top f <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: 3 �� <br /> Condition of UDC prior to <br /> testing: D f k <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No •'NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- No NA Yes No NA Yes No NA Yes No NA <br /> safe shutdown? - <br /> Was fail-safe verified to be <br /> operational?` Yes No NA; Yes No NA Yes No NA Yes No NA <br /> Wait time between applying <br /> pressure/vacuum/water and 16 M fN <br /> starting test /ALI I/&,-I— <br /> Test Start Time: I D <br /> Initial Reading(1Q: 3 , SGg <br /> Test End.Time: <br /> 'Final Reading(RF): <br /> Test Duration: 1!3' ✓WAI. <br /> Change in Reading(RF-Rj): 80;L- I <br /> Pass/Fail Threshold or Criteria: +/-.002 +/-.002 +/-.002 t/-.002 <br /> TestIbsnit~ Tai) Ehss Fail Pass. Fail Pass Fail <br /> Was sensor removed for testing? s No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and e No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />