Laserfiche WebLink
6/09/02 21:02 P.03 <br /> Alltech Consultipg <br /> 17759 Buttercup Circle, Sonora, CA 95370 <br /> Phone: 209-532-7320; Fax: 209-533-2650; MfkeDotten@Hotmall.com <br /> California Tank Tester: 90-1068; California Contractor 623541 A-Haz <br /> ALERT UDE ILL TANK TEST DATA.-SHEET <br /> Facility: Franles, One Stop Date: 6/12/2001 <br /> Address: 2072 W. Yosemite <br /> City: Manteca CA <br /> Facility contact: John Kim, Frank Guinta , <br /> (T2) Product: Supreme (92) Gallons; 66000 Tank ID: <br /> Tank bottom: 132 Subtract fillpipe length: 37" = Tank Diameter: 95" <br /> Product level; 74" Tank water: 0.00" Backfill: 0.00" SGU: 0.730 <br /> Load cell: 2-9150 Power logger: 2 Probe: 28b <br /> Probe weight: 91b. 20z. 4142 <br /> ..- grains <br /> Subtract empty probe weight: -2100 gram@ <br /> Ballast to add- -2042 grams <br /> Tank contains 5,016 gallons = 84% full. (65%-95%) Tare value: 46% <br /> Product pressure at tank bottom: 1.92 psi. <br /> Stabilization time from delivery to start of test: >4 hours. (I hr. Min.) <br /> Data collection began- 1730.hours 6/12 <br /> Data collection ended: 1030 hours 6/13 <br /> Total: 17.00 hours data collection. <br /> Quiet time began: 2300 hours 6/12 <br /> Quiet time ended; 0400 hours 6/12 <br /> Total: 5.00 hours quiet time. (2 hr. minimum) <br /> Filter bandwidth: 100 <br /> Disregard hours front: 14.00 Disregard hours rear: 0.00 <br /> Test time: 2.20 hours. (2 hr. minimum) <br /> Final Dy/ft. +0.028 QP H Pass ED FRA <br /> UnplLetest: Test Method: Alert 1050 (Pressured 0 Pass El Fan <br /> Initial pressure: +1.50 psi, Final pressure: +1.60 AL (1.10 minimum) <br /> Reankj: <br />