Laserfiche WebLink
D. Results of Testing/Servici <br /> Software Version Installed: <br /> i <br /> Complete the following checklist: <br /> es ❑ No* Is the audible alarm operational? <br /> Yes 1 ❑ No* Is the visual alarm operational? <br /> Ef Yes ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> U NTA: operational? <br /> ErYes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) B-Sum—p/Trench Sensors; is enser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? M-Ye—s; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 0 N A mechanical overfill prevention.valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* o Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ffryes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appl)) <br /> ❑Product; ater. If yes, describe causes.in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: f Pa ,- /--,7 1`" <br />