Laserfiche WebLink
l <br />I1IFIED PROGRAM CONSOLIDATED 7KTX-G-E <br />TANKSUNDERGROUND STORAGE TANKS - 2 <br />of <br />UNDERGROUND PIPING <br />ABOVEGROUND PIPING <br />SYSTEM TYPE J*L PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY 458. <br />❑ 1. PRESSURE ❑ 2_ SUCTION ❑ 3. GRAVITY <br />459. <br />CONSTRUCTION/ ❑ 1. SINGLE WALL ❑ 3. LINED TRENCH ❑ 99. OTHER 460. <br />❑ 1. SINGLE WALL ❑ 95. UNKNOWN <br />462. <br />MANUFACTURER 0 2. DOUBLE WALL ❑ 95. UNKNOWN <br />❑ 2. DOUBLE WALL ❑ 99. OTHER <br />MANUFACTURERA. <br />461. <br />MANUFACTURER <br />463. <br />❑ 1. BARE STEEL ❑ 6. FRP COMPATIBLE W/100%METHANOL <br />❑ 1. BARE STEEL ❑ 6. FRP COMPATIBLE W/100% <br />METHANOL <br />❑ 2. STAINLESS STEEL ❑ 7. GALVANIZED STEEL <br />❑ 2. STAINLESS STEEL ❑ 7. GALVANIZED STEEL <br />❑ 3. PLASTIC COMPATIBLE WITH CONTENTS ❑ 95. UNKNOWN <br />❑ 3. PLASTIC COMPATIBLE W/ CONTENTS ❑ 8. FLEXIBLE (HDPE) <br />❑ 99. OTHER <br />® 4. FIBERGLASS [18. FLEXIBLE (HDPE) [199. OTHER <br />❑ 4. FIBERGLASS ❑ 9. CATHODIC PROTECTION <br />❑ 5. STEEL W/COATING ❑ 9. CATHODIC PROTECTION 464. <br />[15. STEEL W/COATING ❑ 95. UNKNOWN <br />465 <br />VII. PIPING LEAK DETECTION (Check au that ) (Aon of the shall be submitted to the local agency.) <br />UNDERGROUND PIPING <br />ABOVEGROUND PIPING <br />SINGLE WALL PIPING 466. <br />PRESSURIZED PIPING (Check all that apply): <br />❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WI AUTO PUMP <br />SHUT-OFF FOR LEAK, SYSTEM FAILURE, AND SYSTEM DISCONNECTION <br />+ AUDIBLE AND VISUAL ALARMS. <br />❑ 2. MONTHLY 0.2 GPH TEST <br />[13. ANNUAL INTEGRITY TEST (0.1 GPH) <br />CONVENTIONAL SUCTION SYSTEMS <br />❑ 5. DAILY VISUAL MONITORING OF PUMPING SYSTEM + TRIENNIAL PIPING <br />INTEGRITY TEST (0.1 GPH) <br />SAFE SUCTION SYSTEMS (NO VALVES IN BELOW GROUND PIPING): <br />❑ 7. SELF MONITORING <br />GRAVITY FLOW <br />[19. BIENNIAL INTEGRITY TEST (0.1 GPH) <br />SECONDARILY CONTAINED PIPING <br />PRESSURIZED PIPING (Check all that apply): <br />10. CONTINUOUS TURBINE SUMP SENSOR W AUDIBLE AND VISUAL <br />ALARMS AND (Check one) <br />* a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br />b. AUTO PUMP SHUT OFF FOR LEAKS, SYSTEM FAILURE AND SYSTEM <br />DISCONNECTION <br />❑c. NO AUTO PUMP SHUT OFF <br />11. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WI' H FLOW SHUT <br />OFF OR RESTRICTION <br />❑ 12. ANNUAL INTEGRITY TEST (0.1 GPH) <br />SUCTION/GRAVITY SYSTEM <br />❑ 13. CONTINUOUS SUMP SENSOR + AUDIBLE AND VISUAL ALARMS <br />EMERGENCY GENERATORS ONLY (Check all that apply) <br />❑ 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br />AUDIBLE AND VISUAL ALARMS <br />❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW <br />SHUT OFF OR RESTRICTION <br />❑ 16. ANNUAL INTEGRITY TEST (0.1 <br />❑ 17. DAILY VISUAL CHECK <br />DISPENSER CONTAINMENT 468. <br />DATE INSTALLED <br />jz-a'1-- o z <br />I certify that the information provided <br />SIGNA , OF O OPERAT <br />NAME OF OWNER/OPERATOR (print): <br />Permit Number (Agency use only) <br />SINGLE WALL PIPING 467. <br />PRESSURIZED PIPING (Check all that apply): <br />❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST y� AUTO PUMP <br />SHUT OFF FOR LEAK, SYSTEM FAILURE, AND SYSTEM DISCONNECTION <br />+ AUDIBLE AND VISUAL ALARMS. <br />❑ 2. MONTHLY 0.2 GPH TEST <br />❑ 3. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 4. DAILY" VISUAL CHECK <br />CONVENTIONAL SUCTION SYSTEMS (Check all that apply) <br />[15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br />[16. TRIENNIAL INTEGRITY TEST (0.1 GPH) <br />SAFE SUCTION SYSTEMS (NO VALVES IN BELOW GROUND PIPING): <br />❑ 7. SELF MONITORING <br />GRAVITY FLOW (Check all that apply): <br />[18. DAILY VISUAL MONITORING <br />[19. BIENNIAL INTEGRITY TEST (0.1 GPH) <br />SECONDARILY CONTAINED PIPING <br />PRESSURIZED PIPING (Check all that apply): <br />10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br />ALARMS AND (Check one) <br />N ❑ UTO PUMP SHUT OFF WHEN A LEAK OCCURS <br />AUTO PUMP SHUT OFF FOR LEAKS, SYSTEM FAILURE AND SYSTEM <br />DISCONNECTION <br />O ❑c. NO AUTO PUMP SHUT OFF <br />ji'lli, <br />AUTOMATIC LEAK DETECTOR <br />El 12. ANNUAL INTEGRITY TEST (0.1 GPH) <br />SUCTION/GRAVITY SYSTEM <br />❑ 13. CONTINUOUS SUMP SENSOR + AUDIBLE AND VISUAL ALARMS <br />EMERGENCY GENERATORS ONLY (Check all that apply) <br />[114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br />AUDIBLE AND VISUAL ALARMS <br />❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) <br />GPH)I❑ 16. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 17. DAILY VISUAL CHECK <br />VIII. DISPENSER CONTAINMENT <br />❑ 1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑ <br />6 2. CONTINUOUS DISPENSER PAN SENSOR + AUDIBLE AND VISUAL ALARMS ❑ <br />❑ 3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑ <br />DISPENSER+ AUDIBLE AND VISUAL ALARMS <br />IX. OWNER/OPERATOR SIGNATURE <br />herein is true and accurate to the best of my knowledge. <br />DATE: / <br />�TICI« 8p-7 TITLE OF OWNER/OPERATOR: <br />473. 1 Permit Approved By (AgencyPermit Expiration <br />use may) <br />474. <br />4. DAILY VISUAL CHECK 469.H/ <br />5. TRENCLTNER MONITORING <br />6. NONE <br />Date (Agency use only) <br />472. <br />475. <br />