Laserfiche WebLink
01/26/2007 09:18 FAX 0 BOYETT PETROLEUM 1a015/015 <br />i 'mining Verification (i.c. Date and Signatures) <br />11 1)(,scriptioiiofliitrodLictoryaiid(,'�OntillLlitl2, rairli (e.g. ype and <br />A111OUnt) <br />iii. Fraining.Records to he Retained for Three Years (or Longer Based <br />01-1 (,)thee' I....aws) <br />iV, I )OCL[Illelltati Oil Must be Available On -Site for Review bV CLJPA <br />Persofinel <br />7..RECORD KEEPING <br />i, All Paperwork Generated Froin Pump Maintenance, Will be Kept <br />Years <br />ii. ,111 Training Mail Lla IS and Training, Sheets; Along With F 'mploycc <br />Names and Dates Will Be Kept Oil -Site for Tilrec 'Yeal-s <br />8.1"RAINING CERTIFICATION <br />i. The Bottom Portionol'This Form is to ( ...Nertify That, 1-JazardOLIS <br />Materials BLISilleSS Flan 'Training Took, Place Orl: t <br />% <br />,:I <br />(Print) . (Sign) <br />............ ........ <br />..... <br />Ili. Responsible ti-aiiied Irl dividt-jal: <br />....(Sign.) <br />i v. It is NoN! the Responsible of the I' i -q ,i - p " q " d, <br />lqdi a <br />, vidual. to Tr tits All Other <br />['.'J1lI)1o.yeeS at the Site oil the Hazardous Materials BLISilICSS Plan. 'rratfung <br />I <br />Should Be in immediately and Retnain ContintiOLIS. <br />5 <br />