Laserfiche WebLink
SWRCB, January 2002 <br />40 10 Page 2 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer FX1 Industry Standard El Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑ Pressure F] <br />Other (Specify) <br />Vacuum El Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 87 <br />Spill Box # 91 <br />Spill Box # dsl <br />Spill Box # <br />rBucket Diameter: <br />12 <br />12 <br />12 <br />t Depth: <br />10 <br />10 <br />10 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />3 0 <br />30 <br />30 <br />Test Start Time: <br />1230 <br />12 3 0 <br />1230 <br />Initial Reading (Ri ): <br />10 <br />8 <br />8.5 <br />Test End Time: <br />1330 <br />1330 <br />1330 <br />Final Reading (RF ): <br />9.5 <br />8 <br />8.5 <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (R F - 14 ) <br />.5 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />3 , <br />``11 wnl ✓aril y is ass Failstrzl <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />