My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_1998-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 10:51:17 AM
Creation date
6/23/2020 6:49:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2007
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_1998-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />40 10 Page 2 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer FX1 Industry Standard El Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑ Pressure F] <br />Other (Specify) <br />Vacuum El Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 87 <br />Spill Box # 91 <br />Spill Box # dsl <br />Spill Box # <br />rBucket Diameter: <br />12 <br />12 <br />12 <br />t Depth: <br />10 <br />10 <br />10 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />3 0 <br />30 <br />30 <br />Test Start Time: <br />1230 <br />12 3 0 <br />1230 <br />Initial Reading (Ri ): <br />10 <br />8 <br />8.5 <br />Test End Time: <br />1330 <br />1330 <br />1330 <br />Final Reading (RF ): <br />9.5 <br />8 <br />8.5 <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (R F - 14 ) <br />.5 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />3 , <br />``11 wnl ✓aril y is ass Failstrzl <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.