My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_1998-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 10:51:17 AM
Creation date
6/23/2020 6:49:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2007
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_1998-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />.fp Tankmillogy <br />TEST DATE: 07/21/05 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER: 2237589 <br />AUSTIN, TEXAS 78759 (512) 451-6334 <br />CLIENT: BOYETT PETROLEUM SITE:H & M (BOYETT PETROLEUM) <br />Tank ID: <br />Product: DIESEL <br />Capacity in gallons: 6,016 <br />Diameter in inches: 95.00 <br />Length in inches: 199 <br />Material: DW STEEL <br />COMMENTS <br />PSI at tank bottom: <br />Fluid level in inches: <br />UFT/OFT: <br />Fluid volume in gallons: <br />Tank water level in inches: <br />Test time: <br />Number of thermisters: <br />Specific gravity: <br />Water table depth in inches: <br />Determined by (method): <br />Leak rate in gph: <br />Result: <br />COMMENTS <br />Test time: <br />Ullage volume: <br />Ullage pressure: <br />Results: <br />3 Tank manifolded: Bottom to top fill in inches: <br />Vent manifolded: Bottom to grade in inches: <br />Vapor recovery manifolded: Fill pipe length in inches: <br />Overfill protection: Fill pipe diameter in inches: <br />Overspill protection: Stage I vapor recovery: <br />Installed: Stage II vapor recovery: <br />CP installed on: <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />DATA FOR UTS-4T ONLY: <br />Time of test 1: <br />Temperature: NOT <br />Flow rate (cfh): TESTED <br />Time of test 2: <br />Temperature: <br />Flow rate (cfh): <br />Time of test 3: <br />Temperature: <br />Flow rate (cfh): <br />COMMENTS <br />Material: <br />Diameter (in): <br />Length (ft): <br />Test psi: <br />Bleedback cc: <br />Test time (min): <br />Test 1: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 2: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 3: Start time: <br />Finish psi: <br />Vol change cc: <br />Final gph: <br />Result: <br />Pump type: <br />Pump make: <br />COMMENTS <br />DW FIBERG <br />NOT NOT <br />TESTED TESTED <br />NOT NOT <br />TESTED TESTED <br />PRESSURE <br />RED JACKET <br />Impact Valves Operational: YES <br />Printed 07/29/2005 08:52 SBOWERS <br />Make: RED JACKET <br />Model: F%1 -Dv <br />S/N: 9166 <br />NOT <br />Open time in sec: 2.00 <br />TESTED <br />Holding psi: 15 <br />Resiliency cc: 70 <br />Test leak rate ml/m: 189.0 <br />Metering psi: 11 <br />Calib. leak in gph: 3.00 <br />Results: PASS <br />COMMENTS <br />DATA FOR UTS-4T ONLY: <br />Time of test 1: <br />Temperature: NOT <br />Flow rate (cfh): TESTED <br />Time of test 2: <br />Temperature: <br />Flow rate (cfh): <br />Time of test 3: <br />Temperature: <br />Flow rate (cfh): <br />COMMENTS <br />Material: <br />Diameter (in): <br />Length (ft): <br />Test psi: <br />Bleedback cc: <br />Test time (min): <br />Test 1: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 2: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 3: Start time: <br />Finish psi: <br />Vol change cc: <br />Final gph: <br />Result: <br />Pump type: <br />Pump make: <br />COMMENTS <br />DW FIBERG <br />NOT NOT <br />TESTED TESTED <br />NOT NOT <br />TESTED TESTED <br />PRESSURE <br />RED JACKET <br />Impact Valves Operational: YES <br />Printed 07/29/2005 08:52 SBOWERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.