Laserfiche WebLink
J ONITO NG SYSTEM CERTIFICAITION <br />For UJW All Jurisdictions Within the State of Califor <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate cert' 'on or report must be prepared <br />for each monitoring system control panel by the technician who performs the work. A copy of thivided to the tank <br />system owner/operator. The owner/operator must submit a copy of this form to the local agencyyI g, within 30 <br />days of test date. <br />A. General Infor ation JUL 2 2004 <br />Facility Name: 7"' No.: <br />Site Address: 2001-ZAt1C1_50,n) ,4 tZ City: $L,4Z0 R/TISIpjDVIUQVII Zp <br />Facility Contact Person: Contact Phone No.: (_� <br />Make/Model of Monitoring System: 7_4 & 3sp Date of Testing/Servicing: <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicatespecific equipment ins ected/seryiced: <br />Tank ID:' _ZJ. 0` <br />0"Tri-Tank Gauging Probc. Model: <br />Tank ID: <br />j�In-Tank Gauging Probe. Model:, -f& `Z. <br />2rAnnular Space or Vault Sensor. Model: f*, � e �- y <br />Annular Space or Vault Sensor. Model: <br />iping Sump / Trench Sensor(s). Model: .5!5,b ""Lea r- <br />& Piping Sump / Trench Sensor(s). Modcl:_ > :> ,» y a T <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: <br />Line Leak Detector. Model: u% i <br />❑�ptlechanical Line Leak Detector. Model: <br />electronic <br />Electronic Line Leak Detector. Model: tJ P it. % <br />ank Overfill / High -Level Sensor. Model:1t>ep?`T'c) &L <br />Tank Overfill / High -Level Sensor. Model: Ztvyf ; w 3v- <br />❑ Other (s ecif a ui mentty2c and model in Section E on Pae 2). <br />❑ Other s eci a ui ment a and model in Section E on Pae 2). <br />Tank ID: Z f✓ 3 <br />0 •Z_ <br />Tank ID: <br />Tank Gauging Probe. Model: _ 2ZSgZ2 <br />❑ In -Tank Gauging Probe. Model: <br />,Annular <br />nnular Space or Vault Sensor. Model: --S <br />❑ Annular Space o Vault Sensor. Model- <br />��„�> <br />(iping Sump /Trench Sensor(s). Model: sS ►� ,r�L`c i <br />❑ Piping Sump / , enc nsor(s). cl: <br />❑ Fill Sump Sensor(s). Model: <br />("Mechanical Line Leak Detector. Modell <br />❑ Fill Sump Sensor(s). Model: <br />❑Mechanical Line Leak Det 1: <br />,J�Ae�e�zLt <br />electronic Line Leak Detector. Model: ` AS i/ <br />or. <br />EI Electronic Line Leak De ctor. Model: <br />Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (s ecify equipment t c and model in Section E on Pae 2). <br />❑ Other (speci a ui mint tZpc and model in Section E on Page 2). <br />Dispenser ID• A- -,4 Z_ <br />Dispenser ID: A <br />C3ispenscr Containment Sensor(s). Model:/U�¢❑ <br />Dom' penser Containment Sensor(s). Model: W 14 <br />"car Valve(s). <br />❑%S ar Valve(s). <br />DIS enser Containment Floats and Chains . <br />is enser Containment Floats and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dis enser Containment Floats and Chain(s). <br />❑ Dispenser Containment Floats and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valvc(s). <br />❑ Shcar Valve(s). <br />❑Dis enser Containment Floats and Chain(s). <br />Cl Dispenser Containment Float(s) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that t information is <br />correct and a Plot Plan showing the layout of monitoring equipment. For any equipm a e of neratin u reports, I have also <br />attached a copy of the rep ch ck aQ� apply): *54ystcm set-up U�,Ala VK,h I ort <br />Technician Name (print): �.j*��"G� Signature: <br />Certification No.:—,, zy 9, License. No.: <br />.1��y�� <br />Testing Company Name;,47- Phone No.:(eOq b~7�f -4000 <br />Site Address: Date of Testing/Servicing:.? /B?70V <br />Page I of 3 03/01 <br />Monitoring System Certification <br />