Laserfiche WebLink
07/28/2004 15:22 209-57 040 BOYETT PETROLEUM PAGE 10/1 <br />,tank Gaining 1 SIR Equipment: <br />�& Check this box if tank gauging is used only for inventory control. <br />Q Check this box if no tank gauging or SIR equipment is installed. <br />Phis section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />�Ojnpjcte the following <br />enecxwaaz: - <br />yes ❑ No* Has all input wiring been inspected for proper entry and termination, Including testing for ground faults? <br />21 yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />gr Yes 0 No* Was accuracy of system product level readings tested? <br />Q No* Was accuracy of system water level readings tested? <br />s ❑ No* Were all probes reinstalled properly? <br />Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />« In the Section H.., below, describe how and when those deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Com tete the iallowin checklist: LLD erformancc? <br />❑ Yes Q No* For equipment start-up or annual equipment certification, was ah 9ak simulated � lat hd to verify p <br />❑ N/A (Check all that apply) Simulated leak rate: Q 3 g.p..; g p• <br />:1 Yes` <br />:1 Yes <br />❑ Yes <br />❑ Yes <br />0 Yes <br />❑ Yes <br />U Yes <br />❑ Yes <br />confirmed operational and accurate <br />® No* Was the testing app )~< <br />❑ No* For mechanical LLDs, docs the <br />❑ NIA <br />❑ No* For electronic LLDs, docs the! <br />❑ N/A <br />❑ No* <br />For electronic LLDs, <br />❑ NIA <br />or disconnected? <br />❑ No* <br />For electron' >J3, <br />❑ N/A <br />I or fails a -sst? <br />❑ No* <br />Fore ctronic LLDs, <br />❑ NIA <br />❑ No* <br />Were all items on the <br />if it detects a leak? <br />shut off <br />a leak? <br />es the turbine automatically shut off if any portion of the monitoring system is disabled <br />does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />all accessible wiring connections been visually inspected? <br />checklist completed? <br />* la the Section H, below, describe how and when these deficiencies were or will be corrected. <br />HA Comments: <br />Page 3 of 3 03101 <br />