My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_1998-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 10:51:17 AM
Creation date
6/23/2020 6:49:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2007
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_1998-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALT&EPARTMENT <br />P. <br />SAN JOAQUIN COUNTY <br />Donna K. Heran, R.E.H.S. <br />y f :< Director 304 East Weber Avenue, Third Floor <br />Al Olsen, R.E.H.S. Stockton, California 95202-2708 <br />Program Manager Telephone: (209) 468-3420 <br />Laurie A. Cotulla, R.E.H.S. <br />Program Manager Fax: (209) 464-0138 <br />July 1, 2004 <br />Hunzicker Electric <br />P.O. Box 1310 <br />Ceres, CA 95307 <br />Re: H & M Market, 2501 Jackson Ave., Escalon CA <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />The permit application to replace the direct bury spill containment on the premium 91 <br />and regular 87 and the drop tubes with overfill flapper on the premium 91 and unleaded <br />87 underground storage tank system for the above referenced facility has been approved <br />with the following conditions: <br />1. Contact the San Joaquin Valley Air Pollution Control District and local Fire <br />Department for all necessary permits if applicable. <br />2. The installation of equipment must follow the manufacturers instructions. <br />3. Provide installation -training certifications for all equipment being installed. <br />4. EHD must witness a measurement of the drop tubes to determine 95% shutoff for <br />overfill protection. <br />5. EHD must witness the testing of the spill containment with product before <br />backfilling may occur. <br />6. All metal parts of the risers must be verified by EHD to have corrosion protection. <br />7. A third party tank tightness test must be performed after concrete has been poured <br />and the results must be received within seven days of testing. <br />8. Annual spill containment testing (Health and Safety Code §25284.2) must be <br />performed by 12/31/04. <br />9. A site health and safety plan must be available onsite for review during <br />construction. <br />Schedule all appointments 48 hours in advance. <br />This permit expires on 10/1/04. <br />If you have any questions please contact me at (209) 468-9848. <br />Thank you, <br />Ray von Floe, R.E.H.S. <br />Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.