My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_1998-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 10:51:17 AM
Creation date
6/23/2020 6:49:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2007
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_1998-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Hunzicker Electric <br />P O Box 1310 <br />Ceres, Ca. 95307-1310 <br />mice: (910) 447-9590 <br />fax: (910) 4477-9591 <br />C-10, General A, Haz <br />[�•�li�:�►•LIIILl <br />San Joaquin County <br />Environmental Health Department <br />Third Floor <br />304 East Weber Avenue <br />Stockton, Ca 95202 <br />REF: Boyett Petroleum at H & M Market, 2501 Jackson Avenue, Escalon, Ca 95320 <br />Dear Sir/Madam, <br />Hunzicker Electric has contracted with Boyett Petroleum (Modesto, Ca) to perform the <br />EVR Upgrade work on the Regular Unleaded and the Premium Unleaded underground <br />storage tanks. Any replaced piping will be of black iron with 20mil wrap. <br />The choice of equipment to install is the Phil-tite 85000 series direct bury fill point <br />containments. Hunzicker electric will perform an ST -30 test and the drop tube drain <br />valve test prior to backfilling the openings. <br />A representative of your office is encouraged to attend the site for inspections as your <br />office dictates. <br />The date of completion is less than 30 days, please process the permit application, <br />to allow for the short time frame. Thank you. <br />Since�bly, <br />Alan Hunzicker <br />
The URL can be used to link to this page
Your browser does not support the video tag.