Laserfiche WebLink
09/24/2007 MON 13:55 FAX 2094683433 <br />SJC EHD <br />********************* <br />*** FAX TX REPORT *** <br />********************* <br />TRANSMISSION OK <br />JOB NO. 0569 <br />DESTINATION ADDRESS 95776040 <br />PSWD/SUBADDRESS <br />DESTINATION ID <br />ST. TIME 09/24 13:54 <br />USAGE T 00'56 <br />PGS. 3 <br />RESULT OK <br />UNDERGROUND STORAGE TANK MONITORING PLAN <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited.• Title 23 CCR, Sections 2632(d)(1). 2634(d)(2). and 2641(h) <br />TYPE OF ACTION ❑ L NEW PLAN ® 2. CHANGE OF INFORMATION <br />M01. <br />PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />Moe. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) _ <br />FACILITY NAME H & M MARKET <br />Mol, <br />FACILITY SITE ADDRESS 2501 JACKSON AVE. M04 <br />CITY ESCALON, CA. 95320 <br />Mos. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />M06. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED ® L ANNUALLY ❑ 99. OTHER (Specify): <br />MOT <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />tine leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan ma 2, etc.) which shows all required information include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />MIO. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />Mll. <br />PANEL MANUFACTURER: VEEDER ROOT M12. MODEL #: TLS - 350 <br />Mu. <br />LEAK SENSOR MANUFACTURER: VEEDER ROOT M14. MODEL #(S): TLS - 350 <br />MI5. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL #: <br />M17. <br />1N -TANK PROBE MANUFACTURER: MI6. MODEL #(S): <br />MI°. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): M22. <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M2s <br />® 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ® a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />❑ 6.VISUALMONITORINGDONE: ❑ a. DAILY ❑ b. WEEKLY mc*reaasemyappmi) <br />❑ 99. OTHER (Specify): <br />M28. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />Mao. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE❑ d. UNDER VACUUM <br />Mll. <br />PANEL MANUFACTURER: VEEDER ROOT M32. MODEL #: TLS - 35O <br />"33 <br />LEAK SENSOR MANUFACTURER: VEEDER ROOT M34. MODEL #(S): TLS - 350 <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ❑ b. NO <br />M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M37. <br />® 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />!S1 <br />