Laserfiche WebLink
Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ALL SPILL BOXES WERE NOT TESTED DUE TO ANNUAL MONITOR CERTIFICATION. <br />SWRCB, January 2002 <br />Page _7_ of —7- <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested IZ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # Spill Box # <br />Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-R): <br />Pass/Fail Threshold or <br />Criteria: <br />Tes„t;Result: <br />❑ Pass ; ❑Fail ❑pass ❑ Fail '' ❑Pass ❑Fail. ❑Pass ❑-:Fail” <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ALL SPILL BOXES WERE NOT TESTED DUE TO ANNUAL MONITOR CERTIFICATION. <br />