My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 11:12:52 AM
Creation date
6/23/2020 6:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) N <br />1. Site map enclosed? YES [ ] NO pQ z, Qkp�rtavEs <br />V2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): / <br />'OLJ W�S�YE. <br />cm co 3*cl f3t.Ge-49trAG %SPS istizS ,) <br />61 AJ STS Two Cad <br />R,Tw T u/444 rr1 Ta G1(-QA4z c o <br />'g,Ls�cJ i cy G 3 -t• o �S^`' S ��� � s -t�CL � �. R��'�Ov Ct; 7^w o <br />(A U C. to <br />��(t�STi�L� �ts�. << t� GtI•QA�.Go �.t��, Ivo S N L f <br />�vu� NPs noISPesUZ. <br />e_.� (N S cA t rt ST A70 o rt �k P� G t v s � c. � 1. S. 0. onI <br />Cr. A,(z. ,g. EXE, Cvnyf- �n2��R v C, • <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />SEE AT`` A C, 4 ED U s T- - Oaf QV TiA w f,- L -.r B r, jp 510o a. <br />Q s ('90-7. <br />V, <br />
The URL can be used to link to this page
Your browser does not support the video tag.