Laserfiche WebLink
`w:riTrAug. 2. 2010,e 4.28MeorcDon ee Pump Co. No. 7421 <br />Subject: Fw: $ravo Systems Conversion Frame Ordering <br />From: "Don" <donm@donleepump.corn> <br />Date: Mon, 2 Aug 2010 15:09:57 -0700 <br />To: <riche@dordeepump.com>, <davey@donleepump.com>, <richh@don1eepump.com> <br />From: Jonathan Smith <br />Sent: Monday, August 02, 2010 1:37 PM <br />To., acaca it0sicehd.com <br />Cc: donlee donlee um .corn ; daye.schuler riwou_ mo com <br />Subject: Bravo Systems Conversion Frame Ordering <br />m= <br />Please find attached the original paperwork request for Conversion Frame approval, including your Fax <br />to Don Lee Pump and the completed Conv-B2000 forms they supplied. Also attached is the Conv-132000 <br />drawing for both of these dispenser upgrades. <br />in reviewing your correspondence to Don Lee Pump, i noticed something that requires clarification. You <br />state that Bravo will respond to an order form submission with a letter stating that we can build a <br />conversion frame product to meet their needs. Leveraging nearly 20 years of building this product - <br />sixteen years before the SWRCS mandated the use of an approved UDSCCS in December 2007 - we <br />have the experience and database to accommodate any dispenser upgrade or downgrade. As part of the <br />order process, we typically do not issue written letters of compatibility for orders. We do, however supply <br />a drawing such as the one included in this email. By supplying a drawing, we are certifying that the frame <br />model in the drawing is engineered to upgrade the existing dispenser to the new dispenser as detailed in <br />the order form. All of the drawings in our internal database have been painstakingly cross-referenced <br />against the manufacturer's footprint and hydraulic cabinet dimensions as provided by the dispenser <br />manufacturer. In addition to this, every order is re -verified in the same manner at the time of order and <br />just prior to manufacture. <br />For future upgrades, please feel free to distribute the attached revised Conversion Frame order form we <br />are calling the Dispenser Site Survey form. This form was created to better assist with recordkeeping on <br />a per -site basis. The form allows for single or multiple dispenser model upgrades before submission to <br />Bravo Systems for ordering and includes important information like Site number, name and address as <br />. This is an improvement over the old form and will <br />well as the name of the person who surveyed the site <br />soon be replacing the existing order form on our website. <br />Jonathan Smith <br />Operations Officer <br />S. Bravo Systems, Inc. - The Leader in Secondary Containment <br />323-888-4133 <br />www.sbravo.com <br />SFRE 10073016060.pdf <br />Content -Type: <br />application/pdf <br />Content -Encoding: base64 <br />C0NV-B2000-530-383.pdf Content -Type: application/pdf <br />>f 2 <br />