My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 11:12:52 AM
Creation date
6/23/2020 6:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING RECORD <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited.- Title 23, Div. 3, Ch. l6 California Code of Regulations(CCR) <br /> Facility Mame: <br /> Facility Site Address: ��() City: <br /> Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br /> pmm& % facility employees vaho have with the op-.XU\'n oc <br /> underground storage tank(UST)systems.This training must be provided by July 1,2005, and every 12 months thereafter. For <br /> facility employees hired after July 1,2005,the initial training must be provided within 30 days of the date of hire. At least one <br /> of the facility employees present during operating hours must have current training. This training must include, but is not <br /> lira teij to, the following items as specified in 23 CCR Sections 27 t 5(f)(1)and(2): <br /> Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br /> The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br /> The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> Name(s)of contact person(s)for emergencies and monitoring equipment alarms; <br /> ❑ For facilities that are not routinely staffed,facility employee responsibilities as specified in the training program <br /> approved by the local UST regulatory.agency. <br /> 23 CCR §2715(f)(3)requires that a list of employees who have been trained by the Designated Underground Storage Tank <br /> Operator(s)be maintained on-site,or off-site at a readily-available location if approved by the local agency,and provided to <br /> the local agency upon request.Completion of this form will satisfy UST training record keeping requirements.The following <br /> employees have been trained as required by 23 CCR Sections 2715(t)(1)and(2): <br /> Facility Eto ee Name Irainin Date Hire Datel T ner NameZ <br /> ( (Continued on reverse) <br /> If hired after fuly 1,2005 <br /> ''framer most be a current Designated LIS f Operator for the facility at the time of training <br /> UN-061 -1/2 WWW.umidocs.org 07/13/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.