My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 11:12:52 AM
Creation date
6/23/2020 6:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Don Mukai - 2 - <br />CONV-82000 product literature; State Registered Professional Engineer Approval letter; <br />Conversion Frame Specifications; and Bravo Conversion Frame Installation Instructions. <br />State Water Board staff also visited the Bravo production facility where the CONV- <br />B2000 is manufactured. A California registered Professional Engineer has reviewed the <br />Bravo catalog sheet with specifications and the B2000 Conversion Frame Installation <br />Instructions and has concluded that the frame is acceptable for adapting an existing <br />installed UDC to a new dispenser (See Enclosure). <br />Conditions of Approval <br />Based on the Professional Engineer's review and the documentation you've submitted, <br />we are granting approval of the CONV-62000 under the following conditions: <br />1. This model comes in several sizes in order to accommodate various dimensions <br />of UDC and dispenser. Schematics of all existing and future sizes for the CONV- <br />B2000 shall be made available upon request of the State Water Resources <br />Control Board (State Water Board). <br />2. Materials and procedures employed in the construction of the CONV-132000 shall <br />remain the same as the materials that were indicated in the documents reviewed <br />by the State Water Board. <br />3. Installation procedures in no way supersede local, State, and federal regulations. <br />Installers must obey all local laws, regulations, and requirements when installing <br />the CONV-132000. <br />4. The procedures (Bravo Conversion Frame Installation Instructions, dated <br />3/25/08) submitted in the approval process must be followed in their entirety. <br />Any variations in the installation procedures must be reviewed and approved by <br />the State Water Board. <br />5. Only installers meeting the requirements of CCR, Title 23, section 2715(h), <br />including training and certification by the manufacturer (S. Bravo Systems, Inc.), <br />are allowed to install this product. <br />6. Final authority to approve the use of the CONY -132000 in a particular jurisdiction <br />rests with the local regulatory agency. The local agency may require pre - <br />approval, permit, and/or inspection of the installation by either local agency staff <br />or a registered professional engineer (special inspector) who has education and <br />experience with underground storage tank system installations. <br />7. Per CCR, § 2636(f)(1) the UDC must be equipped with a continuous monitoring <br />system that either activates an audible and visual alarm or stops the flow of <br />California Environmental Protection Agency <br />eRecycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.