Laserfiche WebLink
0 0 <br /> au+N\ <br /> ,ocp'. JOAQUIN Environmental Health Department <br /> z� SAN� <br /> COUNTY Linda Turkatte, REHS, Director <br /> cq<,Foa`P. Greatness grows here. Kasey Foley,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> Rodney Estrada,REHS <br /> Willy Ng,REHS <br /> Muniappa Naidu,REHS <br /> October 02,2017 <br /> NICHOLAS ROWE <br /> L C SERVICES LARRY&CLIFF ENTERPRISES INC <br /> 3887 N VALENTINE <br /> FRESNO, CA 93722 <br /> Re: H&M-BW#98 SR0078174 <br /> 2501 JACKSON AVE <br /> ESCALON, CA 95320 <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of the <br /> application for a permit to replace the current diesel spill contianer and drop tube with an OPW 2100 spill <br /> contianer and an OPW 71 SO drop tube(prior to the overfill measurement verification inspection, EHD <br /> needs to receive the overfill calcualtions along with the measurements of the drop tube) on the <br /> underground storage tank(UST)system at the above noted address. The permit has been approved with <br /> the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact John Alaniz at(209)468-3147 to arrange the following appointments(a 48-hour notice is <br /> required for inspection appointments). <br /> • Overfill prevention verification: Measurement of drop tubes to verify 95%tank volume shut off. <br /> • Spill bucket test:Verify minimum 5-gallon capacity and pass a one hour hydrostatic test(or <br /> equivalent). Proper drainage must also be verified. <br /> • Corrosion protection:Verify corrosion protection for direct bury spill bucket prior to backfilling. <br /> Please be aware that the facility cannot receive fuel in the Diesel tank prior to the EHD <br /> inspection and approval. <br /> 4. Since concrete will be broken near the Diesel tank, a secondary containment test must be performed <br /> on the Diesel tank once concrete is poured in accordance with the manufacturer's guidelines. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />