My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> OPW NO. 1-2100 SERIES GRADE a non-hardening, gasoline resistant pipe thread seal <br /> LEVEL SPILL CONTAINER compound. Use only factory made nipples. Nipples <br /> INSTALLATION INSTRUCTIONS: must be cut square and deburred. Torque to 125 ft- <br /> lbs min. to 250 ft-lbs max. (4" NPT). Torque value is <br /> Step1. based on rotation at the center of pipe. For standard <br /> Per California SB-989, all metal must be protected cover models install adaptor and dust cap. For <br /> from direct contact with the elements. Coat stainless sealable cover(1 SC) models, install a standard 4" <br /> steel band clamps with the following approved pipe cap to support adjustment system. (Adaptor and <br /> coatings. OPW SL-1100, 3M Underseal 08883 or dust cap must be installed in sealable cover(SC) <br /> Polyguard Mastic CA-9. Only the threaded hardware models after concrete has dried. <br /> needs to be coated in the field. Note: Nipple length is determined by measuring from <br /> the bottom of the threaded portion of the base to the <br /> Step 2: (See Figure 1 &2) bottom of the cover. Then subtract 2"for clearance, <br /> Set riser pipe. L is the distance between the top of height of adaptor and height of cap. Range of nipple <br /> the riser pipe and finish grade. lengths that can be used in all of the OPW spill <br /> Note: The "L"dimensions below factors in a containers: 4" minimum to 14" maximum. <br /> 1"slope to grade. <br /> Model Series "L" Dimension Finish Grade <br /> 1-2100, 5 Gal. (Comp. Base) L=15 5/8"(40cm) <br /> 1-2100E, 7.5 Gal.(Comp. Base) L=19 5/8" (50cm) <br /> 1-2115, 15 Gal. (Comp. Base) L=19 5/8"(50cm) L <br /> 1-2100C, 5 Gal.(Cast Iron Base) L=14 1/2"(37cm) <br /> 1-2100EC,7.5 Gal.(Cast Iron Base) L=18 1/2" (47cm) <br /> 1-2115C, 15 Gal. (Cast Iron Base) L=18 1/2" (47cm) <br /> Note: Fi ure 1 <br /> If using OPW FSA-400, add 3-1/4"to Dimension "L". <br /> If using OPW FSA-400-S, add 1-3/4 to Dimension "L"• Sloe 1" min. <br /> NOTE:FSA-400-S will only work with Cast Iron Base. Finish Grade <br /> Step 3: p <br /> -�' <br /> Deburr and thoroughly clean riser pipe. Apply pipe <br /> dope to riser threads. Pipe dope to be a non- o o:o o.o ° o° �•° o <br /> hardening, gasoline resistant pipe thread seal o�°°'CDDR IRVE ETE o <br /> ° <br /> compound. ° a°° ° °.. <br /> ° <br /> Dust Cap <br /> Step 4: -- Adaptor <br /> Install OPW FSA-400 Face Seal Adapter onto riser <br /> using the OPW 61SA-TOOL. Torque to 125 ft-lbs j Nipple L <br /> min. to 250 ft-lbs max.(4" NPT). Apply pipe dope to <br /> FSA-400. Pipe dope to be a non-hardening, gasoline <br /> resistant pipe thread seal compound. Bottom of <br /> o , thread in base <br /> Step 5: ' <br /> Install spill container by rotating the mounting ring until <br /> hand tight. Top of Riser Pipe <br /> NOTE:Do not attempt to completely tighten the <br /> container by using the mounting ring <br /> I <br /> Step 6: Riser Pipe <br /> Finish tightening the spill container with the OPW <br /> 61 SA-TOOL. Torque to 125 ft-lbs min.to 250 ft. Lbs. I t <br /> max. (4" NPT) <br /> Note: Ground riser pipe to nearest grounding rod. I', D' Y r,)I <br /> Step 7: (See Figure 2) Figure 2 ) <br /> Apply pipe dope to nipple and install. Pipe dope to be i � s i +._ ^ a� P, <br /> OPW 1-2100 Series Spill Container Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.