My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pa e 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY, 490-2. <br /> (Check one Item only) ❑ 2,THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> 'ORM' T ON <br /> FACILITY ID#(Agency Use Only)_ <br /> BUSINESS NAME(Same as Faciltty Name or DBA) H & M MARKET 3. <br /> BUSINESS SITE ADDRESS 103. CITY ESCALON, CA. 104. <br /> 2501 JACKSON AVE. 95320 <br /> "Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually whichever is more frequent.Such work must be performed byuq alifiedpeersonnel.123 CCR§2632,2634,2638,26411_ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY [199.OTIIER(Specify): _ 490.36. <br /> �II1Vl�YI ' G LOCATI®N►S .: <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED (23 CCR§2632,26341 4904. <br /> I . TANK IVIONiTQRING:I PERI' '® _ Imo_' � .0 �OF� ,OWING"METH®D(S) that j4)1 <br /> 1. <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490.6. <br /> PANEL MANUFACTURER: VEEDER ROOT 490-7. MODEL#: TLS-350 490.8. <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-9' MODEL_#(S): 420 490-10. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 Ica.§26431 490-11. <br /> PANEL MANUFACTURER: 490'12' MODEL M 490-13, <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-I5. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16• <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> _ PROGRAMMED TESTS: Ela.0.1 g.p.h. F1b.0.2 g.p.h. ❑ c.OTHER S eci -490-19. <br /> 49°'15' <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.11 490.20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: E] a.36 HOURS ❑ b.60 HOURS 490-22.0- <br /> 90 22 21 <br /> ❑ 5,TANK INTEGRITY TESTING PER 123 CCR§2643.11 490-23. <br /> TEST FREQUENCY: <br /> ❑ FRE UENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY c.OTHER(S_ec_i 490-25. <br /> 490-26 <br /> 99.OTHER(Specify): 490.2Z <br /> 24. <br /> PAPE MMaiNIT�RINfz,IS PEItI'OR9(IG CTING TILE F®Ial.OIN( IMETH®lD(S) flwiel <br /> �, .. <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-2g.. <br /> [§26 6] SECONDARY CONTAINMENT IS: ® a.DRY C1 b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490.29' <br /> PANEL MANUFACTURER:VEEDER ROOT 490'30• MODEL#: TLS-350 490.31. <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT '90.3x' MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.YES ❑ b.NO 490.34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-35. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36- <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§26361 <br /> MLLD MANUFACTURER(S):MLD/RED JACKET 490-37' MODEL#(s): LD2000/FX1V 490-39, <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.(23 CCR§26361 490.39. <br /> I ELLD MANUFACTURER(S): 490-40' MODEL#(S): 490.41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p,h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 410-41- <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.44. <br /> I ❑ 4.PIPE INTEGRITY TESTING. 49090-45. <br /> I _ 046. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490 4x7. <br /> ❑ 5,VISUAL PIPE MONITORING. 49048. <br /> FRF,QUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49• <br /> 'Allowed for monitoring of unburied emergency generator fuel pipit.on er HSC X2528 L.sfb, <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(-)(3)1 490-50' <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. _49090-51.� <br /> ❑ <br /> 99.OTHER(Specify) "-490-52. <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/6 www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.