Laserfiche WebLink
C.A.R.B.Approved Below Grade Spill ContainersON <br /> - <br /> 705-490-01 5 Gal. Cast Iron Raintight I Pull to Push 705-337-19 g <br /> 705-490-02 5 Gal. Cast Iron Raintight No Drain g <br /> 705-490-03 5 Gal. Cast Iron Watertight Pull to Push 705-337-19 g <br /> 705-490-04 5 Gal. Cast Iron Watertight No Drain B <br /> 705-491-01 5 Gal. Composite Raintight Pull to Push 705-337-19 B <br /> 705-491-02 5 Gal. Composite Raintight No Drain B <br /> 705491-03 5 Gal. Composite Watertight Pull to Push 705-337-19 B <br /> 705-491-04 5 Gal. Composite Watertight No Drain B <br /> 715-490-01 15 Gal. Cast Iron Raintight Pull to Push 705-337-19 C <br /> 715-490-02 15 Gal. Cast Iron Raintight No Drain C <br /> 715-490-03 15 Gal. Cast Iron Watertight Pull to Push 705-337-19 C <br /> 715-49.0-04 15 Gal. Cast Iron Watertight No Drain C <br /> 715-491-01 15 Gal. Composite Raintight Pull to Push 705-337-19 C <br /> 715-491-02 15 Gal. Composite Raintight No Drain C <br /> 715-491-03 15 Gal. Composite Watertight Pull to Push 705-337-19 C <br /> 715-491-04 15 Gal. Composite Watertight No Drain C <br /> 725-490-01 25 Gal. ' Cast Iron Raintight Pull to Push 705-337-19 D <br /> 725-490-02 25 Gal. Cast Iron Raintight No Drain p <br /> 725-490-03 25 Gal. Cast Iron Watertight Pull to Push 705-337-19 D <br /> 725-490-04 25 Gal. Cast Iron Watertight No Drain D <br /> 725-491-01 25 Gal. Composite Raintight Pull to Push 705-337-19 D <br /> 725-491-02 25 Gal. Composite Raintight No Drain D <br /> 725-491-03 25 Gal. Composite Watertight Pull to Push 705-337-19 D <br /> 725-491-04 25 Gal. Composite Watertight i No Drain D <br /> Monthly Recommended Maintenance & Inspection Procedures <br /> 1. Clean/Remove any buildup of sand,gravel,or dirtfrom the manhole top cast flange. Buildup of material will <br /> prevent the manhole lid from sitting fiat and diverting rain water. In addition to water infiltration,this can lead to <br /> premature lid failures and tripping.hazards. <br /> 2.- Inspect the spill container latching mechanism and make sure that it is operating properly. <br /> 3. Inspect the hinged cover gasket and replace it if necessary. <br /> 4. Inspect the spill container for the presence of liquid. If any is present, identify the material(water or fuel)and <br /> dispose of it using your preferred acceptable method(pump it out or drain it into the tank). <br /> 5. Inspect the spill container and the drain valve screen for any foreign material collecting in the bottom of the tank. <br /> Remove any large objects(leaves,rags,etc.)andwipe the bottom of the tank with a disposable rag. <br /> 6. Inspect the tank riser adapter and the dust cap for obvious damage. Verify that the gasket is in the dust cap and <br /> that the dust cap still securely latches onto the adapter. <br /> Post Installation Inspection Procedure <br /> After installing these spill containers, but prior to backfilling the excavation, EBW recommends that the tank system be <br /> checked for potential 1eaks. In CA,utilize TP-201.3, Static;Pressure Test Procedure. In other areas, utilize this or a locally <br /> approved/accepted pressure test procedure. Shoulda leak be present,test the following with an acceptable leak check <br /> fluid:the tank and spill container piping joints,the drain valve poppet and gasket permanent drain blank plate gasket, <br /> and the adapter piping joint. Repair all of the leaks prior to backfilfing. 1 <br /> .,. _ ,` <br />